Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />Table A-3 <br /> <br />SUMMARY OF PRELIMINARY ENGINEERING COSTS <br />INCLUDING ESTIMATED COSTS FOR OUTSIDE PROFESSIONALS <br />SLUDGE PROCESSING FACILITY IMPROVEMENTS <br />LITTLE CEDAR BAYOU WWTP <br /> <br />Basic Services <br /> <br />Preliminary Engineering (lump sum) <br />Final Design Phase (lump sum) <br />Design Services During Construction (lump sum) <br /> <br />Additional Services <br /> <br />Preliminary Engineering Phase <br />Surveying <br />Geotechnical <br /> <br />Final Design Phase <br />Surveying <br />Geotechnical <br /> <br />Construction Phase ' <br />Construction Materials Testing <br />Resident Engineering <br />" Resident Engineering Support <br /> <br />$ 76,500 (Complete) <br />$ 186,983 <br />$ 49,001 <br /> <br />$ 9,000 (Complete) <br />$ 8,000 (Complete) <br /> <br />$ 3,000 <br />$ 15,000 <br /> <br />$ 30,000 <br />$ 112,000 <br />$ 12,370 ' <br /> <br />END OF EXHIBIT A <br /> <br />A-8 <br /> <br />R:\CONTRACI"\LAPORTE\LrrTLE CEDAR BAYOU'\SCOPE.A.DOCTLF <br /> <br />October 19, 2001 <br />