<br />. <br /> <br />e <br /> <br />the application date fIXed above, payment shall be made by the Owner not later than days after <br />the Architect receives the Application for Payment. <br /> <br />5.1.4 Each Application for Payment shall be based on the most recent schedule of values <br />submitted by the Contractor in accordance with the Contract Documents. The schedule of <br />values shall allocate the entire Contract Sum among the various portions of the Work. The <br />schedule of values shall be prepared in such form and supported by such data to substantiate its <br />accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall <br />be used as a basis for reviewing the Contractor's Applications for Payment. <br /> <br />. . . . .. THIS DOCUMENT HAS IMPORTANT LEGAL <br />5.1.5 Applications for Payment shall mdicate the percentage of completIon of each portIOn CONSEOUENCES. CONSULTATION WITH <br />of the Work as of the end of the period covered by the Application for Payment. AN ATTORNEY IS ENCOURAGED WITH <br />RESPECT TO ITS COMPLETION OR <br />5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress MODIFICATION. AUTHENTICATION OF <br />payment shall be computed as follows: THIS ELECTRONIC ALL Y DRAFTED AlA <br />DOCUMENT MAY BE MADE BY USING AlA <br />.1 Take that portion of the Contract Sum properly allocable to completed Work as DOCUMENT 0401. <br />determined by multiplying the percentage completion of each portion of the Work by AlA Doc t A201 1997 G aI <br />the share of the Contract Sum allocated to that portion of the Work in the schedule of Conditio~'":~ the C~ntra~t f~~er; <br />values, less reta~age of. five percent ( Q %). Pend~g f~al determinatio!1 of cost to Construction, is adopted in this document <br />the ~wn~r of changes m the Work. amounts not m dispute shall be mcluded as by reference. Do not use with other <br />proVided m Subparagraph 7.3.8 of AlA Document A2.01-1m. general conditions unless this document is <br />modified. <br /> <br />.2 Add that portion of the Contract Sum properly allocable to materials and equipment <br />delivered and suitably stored at the site for subsequent incorporation in the completed <br />construction (or, if approved in advance by the Owner, suitably stored off the site at a <br />location agreed upon in writing),less retainage of~ percent (~%); <br /> <br />.3 Subtract the aggregate of previous payments made by the Owner; and <br /> <br />This document has been approved and <br />endorsed by The Associated General <br />Contractors of America. <br /> <br />.4 Subtract amounts, if any. for which the Architect has withheld or nullified a <br />Certificate for Payment as provided in Paragraph 9.5 of AIA Document A2.0l-1997. <br /> <br />5.1.7 The progress payment amount determined in accordance with Subparagraph 5.1.6 <br />shall be further modified under the following circumstances: <br /> <br />.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total <br />payments to the full amount of the Contract Sum, less such amounts as the Architect <br />shall determine for incomplete Work, retainage applicable to such work and unsettled <br />claims; and <br />(Subparagraph ~8.5 of AlA Document A201-1.9.97 requires release of applicable retainage upon Substantial <br />Completion oFWOrK with consent of surety, iF any.) <br />. - <br />.2 Add, if fmal completion of the Work is thereafter materially delayed through no fault .. <br />of the Contractor, any additional amounts payable in accordance with Subparagraph <br />9.10.3 of AIA Document A2.01-1m. ... ." <br />.... .... <br />.,,-. . - ..... <br />5.1.8 Reduction or limitation of retainage, if any, shall be as follows: ~ <br />(IFit is intended, prior to Substantial Completion of the mtire Work, to reduce or limit the retainage resulting from <br />the percmtages inserted in Clauses 5.L6.J and 5.1.6.2 above, and this is not explained elsewhere in the Contract <br />Documm/s, insert here provisions for such reduction or limitation.) <br /> <br />C1997 AlA. <br />AlA DOCUMENT A 101-1997 <br />OWNER-CONTRACTOR AGREEMENT <br /> <br />5.1.9 Except with the Owner's prior approval, the Contractor shall not make advance The American Institute of Architects <br />payments to suppliers for materials or equipment which have not been delivered and stored at 1735 New York Avenue, N.W. <br />the site. Washington, D.C. 20006-5292 <br /> <br />o 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1967, 1974, 1977, 1987, 0 1997 by The American InstItute ot <br />Architects. Reproduction of the material herein or substantial quotation of its provisions without written <br />permission of the AlA violates the copyright laws of the United States and will subject the violator to legal <br />prosecution. WARNING: Unlicensed photocopying violates US copyright laws and will subject the violator <br />to legal prosecution. This document was electronically produced with permission of the AlA and can be <br />reproduced in accordance with your license without violation until the date of expiration as noted below. <br />User Document: a101 owner-contr.aia -- 2/1512002. AlA License Number 1007489, which expires on <br />1012/2002. <br /> <br />3 <br />