My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1950-398
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
1950's
>
1950
>
O-1950-398
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:19 PM
Creation date
10/23/2006 4:33:58 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
4/20/1950
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />.' <br /> <br />of one (1) foot on each siele of the sidewalk. <br />6. ~: After the sub-base has been brought to <br />grade and thoroughly compacted, and after the forms have been set, <br />a base course consisting of two (2) inches of bank run sand shall <br />be evenly spre~d and compacted. <br />7. Form,s: Forms shall 1:e metal or loTood and shall <br />be straight, free from warp, and shall be set plumb ann held se- <br />curely in place. If of wood, forms shall be composed of two (2) <br />inch material. <br /> <br />a.Expansion Joints: An approved type of commercial <br />~ pre-molded expansion joint one-half (1/2) inch thick shall be placed <br />where t~o lines of sidewalks intersect, where meeting existing walk, <br />and at intervals of not more than thirty-six ()6) feet throughout <br />the entire length of the sidewalk. At all places where sidewalks <br />meet curbs, a one inch approved type of commercial pre-molded ex- <br />pansion joint shall be provided. All expansion joint material <br />shall extend entirely through the sidewalk and shall extend the en- <br />tire width of the sidewalk. <br /> <br />9. Finish: The sidewalk shall be brought to sub- <br />st~ntially the finished elevation and screened off level. Then a <br />41 topping of one (1) part Portland cement to one (1) part dry fine <br />screened sand shall be applied dry to the sidewalk by the dusting <br />method and floc,ted in with '{-Tood darbies or floats. <br />A second dust coat shall then be applied to fill <br /> <br />in all ION spots and take up all excess water and shall again be <br />flo&ted by means of hand floats to a true even surf~ce, and finally <br />steel-trowellecL at the proper time and a sufficient number of times <br />to produce a smooth, hard, burnished surface, free from waves and <br />other defects. <br /> <br />- <br /> <br />As soon as the surfaces have hardened suffi- <br />ciently, they shall be brushed with e stiff broom to produce a <br />non-slip finish. <br /> <br />Sidewalks shall be blocked into squares Nith <br /> <br />neat steel jointer; also, round off all edges at expansion joints <br /> <br />and at edges, etc., with metal edging tools. <br />
The URL can be used to link to this page
Your browser does not support the video tag.