Laserfiche WebLink
<br />Zone <br />R-1 <br />R-2 <br />R-3 <br />MH <br />NC <br />GC <br />BI <br />LI <br />m <br />PUD <br /> <br />e <br /> <br />e <br /> <br />Runoff coefficients, as shown in Table I, shall be the minimum used, based on total <br />development under existing land zoning regulations. Where land uses other than those <br />listed in Table I are planned, a coefficient shall be developed utilizing values <br />comparable to those shown. Larger coefficients may be used if considered appropriate <br />to the project by the City Engineer. <br /> <br />The time of concentration is defined as the longest time, without unreasonable delay, <br />that will be required for a drop of water to flow from the upper limit of a drainage area <br />to the point of concentration. The time of concentration to any point in a storm <br />drainage system is a combination of the "inlet time" and the time of flow in the drain. <br />The inlet time is the time for water to flow over the surface of the ground to the storm <br />drain inlet. Because the area tributary to most storm sewer inlets is relatively small, it is <br />customary in practice to determine the inlet time on the basis of experience under <br />similar conditions. Inlet time decreases as the slope and the imperviousness of the <br />surface increase, and it increases as the distance over which the water has to travel and <br />retention by the contact surfaces. <br /> <br />Time of concentration shall be computed from Figure 2, and in no case shall the inlet <br />time be more than the time shown in Table I. <br /> <br />Table I <br /> <br />Zoning District Name <br />Low Density Residential <br />Mid Density Residential <br />High Density Residential <br />Manufactured Housing District <br />Neighborhood Commercial District <br />General Commercial District <br />Business Industrial Park District <br />Light Industrial <br />Heavy Industrial <br />Planned Unit Development District <br /> <br />Runoff <br />Coefficient <br />"C" <br />0.50 <br />0.60 <br />0.80 <br />0.55 <br />0.80 <br />0.85 <br />0.85 <br />0.85 <br />0.85 <br />variable <br /> <br />Maximum Inlet <br />Time in <br />Minutes <br />IS <br />IS <br />10 <br />IS <br />10 <br />10 <br />10 <br />10 <br />10 <br />10 to 15 <br /> <br />Miscellaneous Land Uses <br /> <br />Land Use <br /> <br />Runoff Coefficient <br />"C" <br /> <br />Church <br />School <br />Park <br /> <br />0.70 to 0.90 <br />0.50 to 0.90 <br />0.30 to 0.70 <br /> <br />Stormwater Criteria 4 of 12 <br />