My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
R-1999-31
LaPorte
>
Legislative records
>
Resolutions - GR1000-05 Ordinances & Resolutions
>
1990's
>
1999
>
R-1999-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:48:37 PM
Creation date
7/27/2006 2:45:33 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Resolution
Legislative No.
R-1999-31
Date
9/27/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />For developments, which are larger than 50 acres, Harris County Flood Control District and the City <br />Engineer shall approve the detention facility criteria. <br /> <br />5.5.2 {}utlet Sizing <br /> <br />1. The outlet structure shall be designed using the orifice equation as follows: <br />Q = CA X (2ghi12 <br />Where, <br />C=0.8 <br />A = cross sectional area <br />g = 32.2 feet / sec2 <br />h = head differential <br />For head differential use 2' or the 100-year water swface in pond minus the 25-year water <br />surface in receiving channel, if available. <br /> <br />2. Minimum restrictor shall be 6" diameter. <br /> <br />5.5.3 Additional Standards For Detention Basins <br /> <br />The detention facility shall be designed for easy maintenance. For smaller developments the <br />designer is encouraged to use parking lots, underground piping, swales, greenspaces, etc. to <br />achieve the volume required. <br /> <br />For larger developments every consideration shall be given to designing of the facility for <br />multipurpose use, such as playgrounds, ballfields, miniparks, required greenspace, etc., to assure that <br />maintenance will be accomplished. The design shall include the following: <br /> <br />I. an earthen detention basin shall have minimum side slopes of 4:1 and a minimum bottom width <br />of ten feet; <br /> <br />2. the bottom of the detention basin shall have a minimum 0.50% cross slope to facilitate quick <br />drainage. <br /> <br />3. a v-shaped trickle channel a minimum of 5' wide, six-inch thick, reinforced concrete shall be <br />constructed through the detention basin at a longitudinal slope of 0.20% to accommodate low <br />flow and facilitate rapid drainage. For developments less than 3 acres, the trickle channel may <br />be 2 feet wide and 4" thick. <br /> <br />4. a minimum 12-foot wide maintenance berm shall be provided around the perimeter of the <br />detention facility. <br /> <br />5. ingress and egress for maintenance including a dedicated right-of-way if required, shall be <br />provided to the detention basin and clearly shown on the construction drawings or site plan and <br />subdivision plat. <br /> <br />Stonnwater Criteria 6 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.