Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />For developments, which are larger than 50 acres, Harris County Flood Control District and the City <br />Engineer shall approve the detention facility criteria. <br /> <br />5.5.2 {}utlet Sizing <br /> <br />1. The outlet structure shall be designed using the orifice equation as follows: <br />Q = CA X (2ghi12 <br />Where, <br />C=0.8 <br />A = cross sectional area <br />g = 32.2 feet / sec2 <br />h = head differential <br />For head differential use 2' or the 100-year water swface in pond minus the 25-year water <br />surface in receiving channel, if available. <br /> <br />2. Minimum restrictor shall be 6" diameter. <br /> <br />5.5.3 Additional Standards For Detention Basins <br /> <br />The detention facility shall be designed for easy maintenance. For smaller developments the <br />designer is encouraged to use parking lots, underground piping, swales, greenspaces, etc. to <br />achieve the volume required. <br /> <br />For larger developments every consideration shall be given to designing of the facility for <br />multipurpose use, such as playgrounds, ballfields, miniparks, required greenspace, etc., to assure that <br />maintenance will be accomplished. The design shall include the following: <br /> <br />I. an earthen detention basin shall have minimum side slopes of 4:1 and a minimum bottom width <br />of ten feet; <br /> <br />2. the bottom of the detention basin shall have a minimum 0.50% cross slope to facilitate quick <br />drainage. <br /> <br />3. a v-shaped trickle channel a minimum of 5' wide, six-inch thick, reinforced concrete shall be <br />constructed through the detention basin at a longitudinal slope of 0.20% to accommodate low <br />flow and facilitate rapid drainage. For developments less than 3 acres, the trickle channel may <br />be 2 feet wide and 4" thick. <br /> <br />4. a minimum 12-foot wide maintenance berm shall be provided around the perimeter of the <br />detention facility. <br /> <br />5. ingress and egress for maintenance including a dedicated right-of-way if required, shall be <br />provided to the detention basin and clearly shown on the construction drawings or site plan and <br />subdivision plat. <br /> <br />Stonnwater Criteria 6 of 12 <br />