Laserfiche WebLink
<br /> I <br />I ~ hrs. I <br />I <br /> I <br /> It <br /> ! <br /> '~ <br /> : <br />1 ~ hrs. <br />1 ~ hrs. <br />hr. e <br />- <br /> <br />Letter superscripts refer to notes, page 47. <br />20 <br /> <br />Letter superscripts refer to notes, page 47. <br />37 <br /> <br />Steel 2~ in. concrete slabY on metal lath. Ceiling : ~ in. <br />Joists sprayed asbestos fiber on metal lath. (33) .................. <br />(Fabricated 2~ in. concrete floor slabY on metal lath, or 2 in. re- <br />fro~ Rolled inforced gypsum tile covered with ~ in. mortar finish, <br />Sectlons.or on joists. Ceiling of ~ in. 1:2 1:3 gypsum and sand <br />froSh St~IP plaster on metal lath. (9) ",..:.."".......,...........",...,......",. <br /> <br />S~eel)e~r 2~ in. floor slab consisting of 2 in. reinforced gypsum <br />Steel concrete on ~ in. gypsum form boards. Ceiling of <br />Beamsu ~ in. gypsum-perlite plaster on ~ in. perforated gyp_ <br />sum lath attached to ~ in. furring channels spaced <br />12 in. on centers, with interlocking wire clips giving <br />continuous support to lath. 14 gauge galvanized wire <br />secured diagonally to clips or channels at each inter- <br />section. Plaster mix: scratch coat 2 cu. ft. and brown <br />coat 3 cu. ft. perlite to 100 Ibs. gypsum. (88)) ............ <br />2 in. limestone concrete on paper-backed wire fabric. <br />Ceiling of ~ in. thick D.L. listed perforated acous- <br />tical tile attached to joists with special clips and <br />suspension splines. Special clips attached to :l4 <br />in. channels spaced 4 ft. on center. 4 in. D.L. listed <br />insulating batts placed on top of unexposed surface <br />of acoustical tile. Other details as specified in D.L. <br />listingc, under Floor or Roof, and Ceiling Construc- <br />tions-Design No. 1-2 HR. ..............,.....................,........... <br />2 in. concrete floor slabY on metal lath, or 2 in. rein- <br />forced gypsum tile, on joists. Ceiling of :l4 in. 1 :2, <br />1:3 gypsum and sand plaster, or ~ in. 1 :2, 1:3 <br />portland cement and sand plaster with 3 lb. asbestos <br />fiber and 15 lb. hydrated lime per bag cement, on <br />metal lath. (9) ........,..".......,.,.....,..",.........,..."...........",...".. <br />2 in. concrete slabY on metal lath. Ceiling of 1 in. <br />gypsum-perlite plaster, applied to ~ in. perforated <br />gypsum lath attach to ~ in. furring channels spaced <br />16 in. on centers, with interlocking wire clips giving <br />continuous support to lath. Plaster mix: scratch coat <br />2 cu. ft. and brown coat 3 cu. ft. perlite to 100 Ibs. <br />fibered gypsum. (65) ..................,.__..,..............,.................. <br />2 in. floor slab, consisting of 1~ in. reinforced gypsum <br />concrete on ~ in. gypsum form boards. Ceiling <br />of 1711 in. gypsum-perlite plaster on ~ in. perforated <br />gypsum lath, attached to ~ in. furring channels. <br />spaced 12 in. on centers, with interlocking wire clips <br />giving continuous support to lath. Plaster mix: scratch <br />coat 2 cu. ft. and brown coat 3 cu. ft. perlite to 100 Ibs. <br />fibered gypsum. (65) ...........,...................,.......""............... <br />2 in. concrete slabY on metal lath. Ceiling: ~ in. <br />sprayed asbestos fiber on metal lath. (33) ...,..."......... <br />2 in. (measured from face of lath) reinforced concrete <br />slab on metal lath. Ceiling of ~ in. D.L. listed wan <br />boardcc or ~ in. D.L. listed coreboardcc, secured to <br />~ in. furring channels, with sheet-metal screws, or <br />~ in, nailing channels with 1 ~ in. nails. Joints in <br />wallboard or coreboard not taped or cemented. Other <br />detaiis as specified in U.L. listingc, under Floor or <br />Roof, and Ceiling Constructions-Design No. 5-1 HR. <br /> <br />. <br /> <br />· Nonbearing. <br /> <br />Solid <br />Gypsum <br />Board <br />Partitions <br />(Without <br />steel <br />framing) <br /> <br />2 in. total thickness consisting of 1 in. D.L. listed inter- <br />locking laminated gypsum coreboard placed vertically <br />and set in floor and ceiling runners made of 20 gauge <br />sheet metal. ~ in. D.L. listed wallboard applied to <br />the coreboard vertically and secured to the coreboard <br />by an adhesive coating. Wallboard joints butted and <br />staggered with joints of coreboard. Outside joints <br />covered with tape and joint finisher. Other details <br />as specified in D.L. Iistingc, under Walls and Parti- <br />tions-Design No. 3-2 HR <br /> <br />2 hrs.. <br /> <br />Type <br /> <br />Details <br /> <br />FIRE ISISTANCE RATINGS <br /> <br />FLOOR AND CEILING CONSTRUCTIONS-Continued <br />Fire Resistance Ratings Based on Standard Fire Tests <br /> <br />of <br /> <br />Construction <br /> <br />1~ hrs. <br /> <br />2 hrs. <br /> <br />Rating <br /> <br />2 hrs. <br /> <br />2 hrs. <br /> <br />2 hrs. <br /> <br />. <br /> <br />e <br /> <br />. <br /> <br />" <br /> <br /> <br /> <br />(, <br /> <br />1\ <br /> <br />. <br /> <br />e <br /> <br />Shotcrete <br /> <br />Precast <br />Concrete <br />Wan <br />Sections <br /> <br />Type <br /> <br />FIRE RESISTANC~TINGS <br /> <br />WALLS AND PARTITIONS-Continued <br />Fire Resistance Ratings Based on Standard Fire Tests <br /> <br /> <br />Detail. of Construction I Rating <br /> <br /> <br />6 in. hollow panels of pumice concrete; core holes <br />3~ in. to 3~ in., face shell thickness 1 in. to 1~ in. <br />Panels held in alignment and secured together by <br />removing top 5 in. of webs in each panel, and core <br />holes, joints and top 5 in. filled with 1 :5.33 cement <br />salld grout. Joints and top of panels reinforced with <br />~ in. reinforcing bar. (101) .............................................. 4 hrs.. <br /> <br />2 in. precast concrete slabs of expanded shale aggregate, <br />16 in. by 8 ft. laid horizontally and attached each side <br />of 8 in. steel columns spaced 011 8 ft. centers. Hori- <br />zontal joints shiplap type, sealed with mastic. Ver- <br />tical joints butt type centered over columns and calked <br />with asbestos wicking and sealed with mastic. (77) 2~ hrs.. <br /> <br /> <br />6~ in. solid wall composed of 1:4 portland cement and <br />perlite concrete aggregate mixture, applied with spray <br />gun equipment to paper-backed wire fabric, and re- <br />inforced with 16 gauge 2 in. by 2 in. welded wire <br />mesh fastened to 3~ in. steel channel studs. Other <br />details as specified in D.L. listing.: under Walls and <br />Partitions-Design No. 5-4 HR. ".........".,......",.........,.. 4 hrs. <br /> <br />4~ in. solid wall composed of 1 cu. ft. portland cement <br />to 4 cu. ft. D.L. listed vermiculite plaster aggregate, <br />applied with spray machine equipment to paper-backed <br />wire fabric. Wall reinforced with 1~ in. steel chan- <br />nel studs 2 ft. on centers and spaced 1~ in. from <br />paper-backed wire fabric. Other details as specified in <br />D.L. Iistingc, under Walls and Partitions-Design <br />No. 6-5 HR. ,.....................,..,................,.,..................,.......... 4 hrs.. <br /> <br />6 in. solid wall composed of 1:4 portland cement and <br />sand mixture, applied with spray gun equipment. <br />Wall reinforced with ~ in. round bars on 12 in. <br />centers each way at the mid-thiclmess of the wall. <br /> <br />(72) .......,.....,',.."......,.",..,..."...................""..,..,..."................. 3 hrs.. <br /> <br />2~ in. total thickness of 4~:1:7 portland cement, saw- <br />dust and sand mortar sprayed on 4 in. by 4 in. welded <br />wire fabric on steel studs. (9) 1 hr.. <br />