Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />Dust Control Equipment <br /> <br />3 - Bag Filter Dust Collectors <br />1 - Venturi Scrubber <br />1 - Pump <br />Ducts <br />Piping <br />Instrumentation <br /> <br />IV. WASTEWATER RCL STRIPPING SYSTEM - A-3200 BLOCK <br />Project No. W-165 <br /> <br />PURPOSE: <br /> <br />Project provides for the collection of 37,500 pounds per hour of RCL <br />saturated wastewater streams from the Chlor-Pyridine Plant, removal of <br />the mixed RCL's by stripping and then disposal of them by incineration. <br /> <br />PROCESS DESCRIPTION: <br /> <br />With this project, designated RCL saturated wastewater streams will be <br />initially collected in an NBT accumulation sump and then pumped to a <br />SOM gallon holding tank. From this tank, the waste stream will first be <br />fed to a packed column for stream stripping and then secondly to a <br />packed column for air stripping. The overhead vent streams will be <br />collected and fed to the plant "Throx" for burning. <br /> <br />The resultant aqueous bottoms stream will be released to the Plant A <br />601 outfall. <br /> <br />EQUIPMENT LIST: <br /> <br />RCL Saturated Waste H20 Storage <br /> <br />1 - 20' x 20' Storage Tank-lined <br />2 - Pumps <br />Foundations <br />Instrumentation <br />Electrical <br /> <br />A-6 <br />