My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1967-759
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
1960's
>
1967
>
O-1967-759
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:27 PM
Creation date
10/24/2006 11:47:02 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
3/6/1967
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.~ <br />- . <br /> <br />. <br /> <br />. <br /> <br />-9- <br /> <br />No cha~ge, other than meter and service installation <br /> <br />charges, will be made for subsequent connections for buildings <br /> <br />erected on the lots for which proper connection charges as pro- <br /> <br />vided for herein have once been paid. In the absence of factual <br /> <br />proof of such payment;, City records shall be considered as <br /> <br />correct and final. Provided, however, no such connection shall <br /> <br />be made until authorization therefor has been obtained from the <br /> <br />City Clerk. <br /> <br />(4a) No cha~ge, other than meter and service installation <br /> <br />charges, will be made for connections for buildings erected on <br /> <br />4It lots owned by persons,' or their assignees, who have paid for the <br /> <br />installation of lines servi~g said lots, prior to the effective <br /> <br />date of this ordinance. In the absence of factual proof of such <br /> <br />payment, City records shall be considered as correct and final. <br /> <br />Provided,. however, no such connection shall be made until authoriza- <br /> <br />tion therefor has been' obtained from the City Clerk. <br />(5) A parcel of tract for which a proper connection <br /> <br />charge is once paid shall not, on reconnection for any cause <br /> <br />(excepting default in payment to City of charges made by it), <br />be required to pay a second connection charge even though the <br /> <br />reconnect ion be at a different location or in a different street, <br />~ such reconnection to be at the sole cost and expense of the <br />reconnecti~g property. <br />(6) In the event of a dispute or doubt as to the amount <br /> <br />of connection charge to be paid for a particular property or the <br /> <br />method of computing same, the City Clerk, with the advice of the <br /> <br />City Engineer, shall apply that cha~ge or method of computation <br />that most nearly applies to the particular property and his <br /> <br />decision in the matter shall be final. <br /> <br />Section 6. City's lien against property to secure <br />payment of connection charges <br />All property-owners requesting by petition the extension <br />~ of City water and/or sewer mains to provide service to their <br />property, and all property owners desiring to make application <br />and contract for service from any City water and/or sewer main, <br />
The URL can be used to link to this page
Your browser does not support the video tag.