My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1972-759-C
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
1970's
>
1972
>
O-1972-759-C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:30 PM
Creation date
10/24/2006 11:48:38 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
9/7/1972
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />ORDINANCE NO. 759-C <br /> <br />~. <br /> <br />AN ORDINANCE AMENDING SECTION 2 OF ORDINANCE NO. 759, AS <br />AMENDED BY ORDINANCE 759-B, AND PROVIDING AN EFFECTIVE <br />DATE HEREOF. <br /> <br />BE IT ORDAINED BY THE CITY COMMISSION OF THE CITY OF LA <br />PORTE: <br /> <br />Section 1. Section 2 of Ordinance No. 759, as amended <br /> <br />by Ordinance 759-B, is hereby amended, and shall hereafter <br />read as follows: <br /> <br />"Section 2. A connection charge shall be made <br /> <br />against each lot, tract, or parcel of land and the owner <br /> <br />thereof whose water'and sewer line shall be hereafter connected <br /> <br />~.. <br /> <br />with any water main or sanitary sewer main of the City of <br /> <br />La Porte, which charge shall be at the following rates, which <br /> <br />rates are a portion of the total cost of such water and sewer <br /> <br />mains,to-wit: <br /> <br />"(1) $1.25 per front foot of the lot, tract, or <br /> <br />parcel of land to which water connections may be made, plus <br /> <br />a water tapping charge of: <br /> <br />"(a) On connections requiring a 5/8"x3/4" <br /> <br />meter, a fee of $100.00 <br /> <br />"(b) On connections requiring a 1" or <br /> <br />larger meter, at the actual cost of <br /> <br />-. <br /> <br />the materials, plus 10% thereof, and <br /> <br />the labor, plus 20% thereof. <br /> <br />"(c) On existing connections requiring a <br /> <br />larger meter, the cost of the new, <br /> <br />larger meter shall be discounted by the <br /> <br />cost of the existing smaller meter; <br /> <br />"(d) If the connection-requires an excavation <br /> <br />in an asphalt or concrete street, necessi- <br /> <br />tating street repairs, there will be an <br />additional charge of the actual cost of <br /> <br />said street repairs. <br /> <br />-:. <br />
The URL can be used to link to this page
Your browser does not support the video tag.