Laserfiche WebLink
<br />, e e <br />... . ..........~.... <br /> .....:- .. ., <br /> . . '. <br />., . ......... ......,..1':" '0, . <br /> ,.0' <br />::l-:,: ?fi~~;~i::,~:~~~~ <br /> STATION EXTRA EXTRA <br /> NUMBER CAUSE GRASS S.Y. BACKFILL c.Y. <br /> 17+29 Wall Caved In 5.33 12.44 <br /> 18+44 Wet Connect Line in 10.67 24.88 <br /> Wrong Location <br /> 23+82 Over Excavate for Wet 5.33 12.44 <br /> Connect due to Wet <br /> Conditions <br /> 24+24 Install Valve, Cave In 5.33 12.44 <br /> Wet Connect, Line <br /> Location off <br /> *190 L.F. Removal of OJ. caused 83.68 97.92 <br /> ditch to be larger <br /> TOTAL: 197.11 288.96 <br /> <br />o Other stations which were listed in the submitted breakdown were <br />determined not to be appropriate for additional cost. <br /> <br />* <br /> <br />Regarding extra grass and backfill due to removal of Ductile Iron pipe; only <br />190 L.F. was removed; therefore Utilizing the same ratio as the submittal for 555 <br />L.F. of Ductile Iron pipe removed and assuming an average depth of 5.5', the <br />amounts were adjusted to reflect 190 L.F. ductile iron pipe removed. <br /> <br />This results in a cost of: <br /> <br />Additional Grass Sod <br />Extra Backfill <br /> <br />197.11 @ $3.00 per S.Y. = <br />288.96 @ $8.00 per S. Y. = <br /> <br />TOTAL= <br /> <br />$ 591.33 <br />$2,311.68 <br /> <br />$2,903.01 <br />