My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1992-1879
LaPorte
>
.Ordinances
>
1990's
>
1992
>
O-1992-1879
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:52 PM
Creation date
10/24/2006 5:16:54 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
12/14/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />SECTION 5 - PAYMENTS TO ARCHITECT <br /> <br />5.1 OWNER has established an initial construction cost limit <br />of one hundred, seventy-six thousand, three hundred sixty seven <br />dollars ($176,367.00) for the Project plus a five percent (5%) <br />contingency for a total of one hundred eighty-five thousand, one <br />hundred eighty five dollars ($185,185.00) available for <br />construction. <br /> <br />5.1.1 For Basic Services. OWNER shall pay ARCHITECT for Basic <br />services rendered under section 1 (as amended and supplemented by <br />Exhibit A "Further Description of Basic Services and Related <br />Matters") as follows: <br /> <br />5.1.1.1 A stipulated lump sum in the amount of <br />thousand. eiaht hundred fifteen dollars ($14.815.00). <br />payments for Basic Services in each phase shall total the <br />percentages of the total basic compensation payable: <br /> <br />fourteen <br />Progress <br />following <br /> <br />Construction Documents Phase <br />Construction Phase <br /> <br />seventY-five percent ( 75%) <br />twenty-five percent ( 25%) <br /> <br />Total Compensation for Basic Services <br /> <br />$ 14.815.00 <br /> <br />5.1.1.2 Should the ARCHITECT's Preliminary Construction Cost <br />Estimate exceed the lowest bona fide proposal or bid amount in <br />section 5.1 as available for construction, the ARCHITECT may be <br />required at the discretion of the OWNER to amend the design to <br />bring the construction cost estimate within the amount specified <br />without additional cost to the OWNER. <br /> <br />5.1.1.3 If the work is not carried on after Construction Document <br />Phase and drawings, specifications and Construction Documents are <br />completed and approved, the OWNER will pay the ARCHITECT through <br />the Construction Documents Phase in accordance with Section 5.1.1 <br />above; or, if the bids have been received, the OWNER will in <br />addition pay the ARCHITECT seventv-five percent ( 75%) of the lump- <br />sum fee as specified in Section 5.1.1.1. <br /> <br />5.1.2 For Additional Services. OWNER shall pay ARCHITECT for <br />Additional Services rendered under Section 2 as follows: <br /> <br />On an hourly basis, using Standard Office Billing Rates <br />and Categories identified in paragraph 5.5 of this <br />Agreement, or as mutually agreed between OWNER and <br />ARCHITECT prior to the commencement of any such services. <br /> <br />5.1.2.1 Resident Project Services. For Services of ARCHITECT's <br />Resident Project Representative (and assistants) furnished under <br />paragraph 1.6.2.1., compensation shall be computed as follows: <br /> <br />5-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.