<br />. <br /> <br />. <br /> <br />9 . Reports: <br /> <br />a. Furnish ARCHITECT periodic reports as required <br />of progress schedule and schedule of Shop <br />Drawing and sample submittals. <br /> <br />b. Consult with ARCHITECT in advance of scheduled <br />major tests, inspections or start of important <br />phases of the Work.. <br /> <br />c. Draft proposed Change Orders and Work <br />Directive Changes, obtaining backup material <br />from CONTRACTOR and recommend to ARCHITECT <br />Change Orders, Work Directive changes, and <br />Field Orders. <br /> <br />d. Report immediately to ARCHITECT and OWNER upon <br />the occurrence of any accident. <br /> <br />10. Payment Requests: <br />Review applications for payment with CONTRACTOR for <br />compliance with the established procedure for their <br />submission and forward with recommendations to <br />ARCHITECT, noting particularly the relationship of <br />the payment requested to the schedule of values, <br />Work completed, and materials and equipment <br />delivered at the site but not incorporated in the <br />Work. <br /> <br />11. Certificates, Maintenance and Operation Manuals: <br />During the course of the Work, verify that <br />certificates, maintenance and operation manuals and <br />other data required to be assembled and furnished <br />by CONTRACTOR are applicable to the items actually <br />installed and in accordance with the Contract <br />Documents, and have this material delivered to <br />ARCHITECT for review and forwarding to OWNER prior <br />to final payment for the Work. <br /> <br />12. Completion: <br />a. Before ARCHITECT issues a Certificate of <br />Substantial Completion, submit to CONTRACTOR a <br />list of observed items requiring completion or <br />correction. <br /> <br />b. Conduct final inspection in the company of <br />ARCHITECT, OWNER, and CONTRACTOR and prepare a <br />final list of items to be completed or <br />corrected. <br /> <br />c. <br /> <br />Observe that all <br />completed or <br />recommendations <br />acceptance. <br /> <br />items on final list have been <br />corrected and make <br />to ARCHITECT concerning <br /> <br />B-4 <br />