Laserfiche WebLink
<br />. <br /> <br />Fe. <br /> <br />. <br /> <br />FROST CONSTRUCTORS, INC. <br /> <br />20202 HWY 59 NORTH, &UITE 240 <br />HUMBLE, TEXAS 77338 <br />(713) 446-6522 <br />FAX: 446-0552 <br /> <br />November 2, 1993 <br /> <br />Mr. Charles R. Harrington <br />Director of Planning <br />City of LaPorte <br />P.O. Box 1115 <br />LaPorte, TX 77572-1115 <br /> <br />RE: Covered Riding Arena <br /> <br />The following are proposed changes to the base bid: <br /> <br />1. Install cable bracing in lieu of X bracing <br />2. Eliminate all wall sheets <br /> <br />Base Bid <br />Credit for above changes <br /> <br />Revised Bid Amount <br /> <br />$ 191,077.00 <br />11,400.00 <br />$ 179,677.00 <br /> <br />Sincerely, <br /> <br />\)~ ~~ <br /> <br />Dale Frost <br /> <br />RE EIVED <br />/I ~ ~ <br />PLANNING <br />