My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1990-1710
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1990
>
O-1990-1710
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:48 PM
Creation date
10/25/2006 3:53:03 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
6/25/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />e <br /> <br />.. ' <br /> <br />~; <br /> <br />CMI Proposal <br />City of Laporte <br />6-8-90 <br />Page 5 of 13 <br /> <br />o Review contractor's schedule regularly. Coordinate with the <br />City and the design engineering firm. <br /> <br />o Review monthly progress schedules submitted to the City by the <br />design engineering firm. <br /> <br />o Provide recommendations adjustments to the schedule and <br />coordinate with the design engineer and the City. <br /> <br />o Review construction progress and recommendation for Periodic <br />and Final Payments made by the design engineering firm. <br /> <br />o Conduct periodic site visits at intervals appropriate to the <br />various stages of construction to observe the progress and <br />quality of executed work of the Contractor(s). <br /> <br />o Review change orders and assist the' City and the design <br />engineer in the negotiation and processing of change orders. <br /> <br />o Review submittals and shop drawings and design engineer's <br />review and response to submittals and shop drawings. <br /> <br />o Coordinate with the design firm and the City of La Porte on <br />all directives dealing with memorandums of agreement, time <br />extensions, proposals, change orders and shop drawings. <br /> <br />o Coordinate the Activities of Materials Testing laboratory and <br />review test results. <br /> <br />o Contract the design firm for input on key issues and changes <br />to the project. <br /> <br />o Hold meetings with the design firm, as required, to verify and <br />maintain the intent of the design. <br /> <br />o Attend monthly or periodic progress meetings. Maintain <br />meeting notes and distribute the minutes to all attendees. <br /> <br />o Assist the design firm in conducting a final inspection in the <br />company of the City of La Porte. <br /> <br />o Assist the design firm in the preparation of red line <br />drawings, by providing information and coordination. It is <br />eMI's understanding that the design firm will perform the <br />drafting and reV1Slons to the drawings, as well as all <br />reproduction of record drawings and copies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.