My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1992-1809
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1992
>
O-1992-1809
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:51 PM
Creation date
10/25/2006 5:21:50 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
2/24/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(e <br /> <br />'e <br /> <br />CITY OF LA PORTE <br /> <br />INTER OFFICE MEMORANDUM <br /> <br />January 27, 1992 <br /> <br />TO: , ~~~ T. Herrera, City ~anager <br /> <br />FROM:~~ Gillett, Director of Public Works <br /> <br />SUBJEc?: Proposed Street Improvements <br />East H Street Between S. Virginia and S. Utah <br /> <br />The 1991-92 Budget allocated 5175,000 for replacement of the <br />concrete pavement on East H Street. The replacement is necessary <br />due to damages from sewer repair, construction of the East La Porte <br />Relief Sewer and deteriorating storm sewers.The budgeted amount <br />included street replacement and storm sewer rehabilitation. <br /> <br />A routine T.V. inspection of the existing sanitary sewer revealed <br />advanced decay of the pipe material. Additionally, the line is <br />located under the paved street section and is undersized. In fact, <br />the existing 8" line carries sewer from two intersecting 8" lines. <br />It is recommended that the existing 8" sanitary sewer located under <br />this street be enlarged and relocated adjacent to the pavement. <br /> <br />H. Carlos Smith Ensineers and Surveyors, Inc. was asked to examine <br />the proposed project and develop a proposal to design the necessary <br />improvements. A preliminary estimate from the Engineer is <br />extremely close to the budgeted amount. The Engineer has proposed <br />a design and construction administration budget of $14,000. <br /> <br />Additional funds are available from the Street Division's operating <br />budget. A total of $90,000 was budgeted for contract overlay. <br />Through an interlocal agreement with Harris County, $70,000 was <br />approved by Council for the overlay program. A total of $20,000 <br />remains, which could be used to fund the engineering of the East <br />H Street Project. The proposed budget is attached for your review. <br /> <br />A formal propo.sal from the Engineer, with all phases of the work <br />identified with cost, will be available soon. I will forward it <br />for further review as it becomes available. If you have any <br />questions, please advise. <br /> <br />Attachments <br /> <br />xc: John Joerns, Assistant City Manager <br />Orville Burgess, Street Superintendent <br />
The URL can be used to link to this page
Your browser does not support the video tag.