My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1992-1834
LaPorte
>
Legislative records
>
Ordinances - GR1000-05
>
1990's
>
1992
>
O-1992-1834
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:51 PM
Creation date
10/25/2006 7:22:52 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
6/8/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />adapt or conform its FACILITIES to enable any other enti ty or <br />person, except the CITY, to use, or to use with greater convenience, <br />RIGHTS-OF-WAY or public property, TELEPHONE COMPAliY shall not be <br />required to make any such changes until such other entity or person <br />shall reimburse or make arrangements satisfactory to TELEPHONE <br />COMPANY to reimburse the TELEPHONE COMPANY for any loss and expense <br />caused by or arising out of such change; provided, however, that the <br />CITY shall never be liable for such reimbursement. <br /> <br />(d) For public improvement projects where, after notification that <br />facility relocation is required, the TELEPHONE COMPANY has not, <br />prior to the beginning of construction by the CITY, relocated its <br />affected FACILITIES within the RIGHTS-OF-WAY after being afforded a <br />reasonable length of time to do so as determined by the City <br />Engineer, giving consideration to the scope of the facility <br />relocation, and when such delays are not caused by actions of the <br />CITY, the following procedure will be followed. The CITY shall <br />provide the TELEPHONE COMPANY with reasonable notice of failure to <br />act and request relocation. If the TELEPHONE COMPANY continues to <br />delay, the City Engineer and the TELEPHONE COMPANY'S Division <br />Manager over outside plant engineering and construction will jointly <br />review the relocation request in an expeditious manner to establish <br />a mutually acceptable completion date for the relocation. If the <br /> <br />-16- <br />
The URL can be used to link to this page
Your browser does not support the video tag.