Laserfiche WebLink
<br />OS/26/2004 14:31 <br /> <br />71368619 <br /> <br />CSA HOUSTON <br /> <br />PAGE 02 <br /> <br />e <br /> <br />LA PORTE, LimE CEDAR BAYOU WWTP <br />CSA <br />CHANGE ORDER PROPOSAL FOR WALlACE & TIERNAN (MOODY BROS.) POLYMER PUMPS <br /> <br />Items Quan U UnitL Labor Unit M Material TOTAL <br />PUMPS AND ACCESSORIES - MOODY 1 LS 0.00 0,00 24,500.00 24,500.00 24,500.00 <br />MODIFY CONTROL PANEL 1 LS 0,00 0.00 1,850,00 1,850.00 1,850.00 <br />INSTALL PUMPS 2 EA 75.00 150.00 25.00 50.00 200.00 <br />INSTALL BACKPRESS VALVES. 1.5" 2EA 18.00 36.00 6,00 12.00 48.00 <br />INSTALL PRESSURE RELIEF VALVES, 1.5" 2 EA 18.00 36.00 6.00 12,00 48.00 <br />INSTALL PULSATION DAMPENERS 2EA 18.00 36.00 6,00 12,00 48.00 <br />INSTALL CALIBRATION COLUMN 1 EA 18.00 18.00 6.00 6,00 24.00 <br />PVC BALL VALVES, 2" 7 EA 0.00 0.00 44.60 312.20 312.20 <br />PVC TEE 16 EA 0.00 0.00 11.62 185.92 185,92 <br />PVC 90 BEND 16 EA 0.00 0.00 3.26 52.16 52.16 <br />2" BUSHINGS 6EA 0.00 0,00 4.20 25.20 25.20 <br />2" PVC PIPE 20 LF 0.00 0.00 1,16 23.20 23,20 <br />INSTALL PVC FTGS 45 EA 14.00 630.00 4,00 180.00 810.00 <br />INSTALL PVC PIPE 20 LF 4.00 80.00 1.00 20,00 100.00 <br />PIPE CLAMPS 10 EA 8.00 80,00 3.00 30,00 110,00 <br /> 1,066 27,271 28,337 <br /> 38% LABOR BURDEN 405 <br /> --- <br /> SUBTOTAL 28,742 <br /> 15% OVERHEAD & PROFIT 4,311 <br /> TOTAL 33.053 <br />