My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2004-2761
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2004
>
O-2004-2761
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:14 PM
Creation date
10/26/2006 9:09:34 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
8/23/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />~. <br /> <br />e <br /> <br />REQUEST FOR CITY COUNCIL AGENDA ITEM <br /> <br />Agenda Date Requested: <br /> <br /> <br />Aoorooriation <br /> <br />Requested By: <br /> <br />Source of Funds: Fund 043 <br /> <br />Department: Publi.: Works <br /> <br />Account Number: 043-9892-882-9110 <br /> <br />Report: <br /> <br />Resolution: <br /> <br />Ordinance: XX <br /> <br />Amount Budgeted: ~1~4,OJ1.00 <br /> <br />Exhibits: <br /> <br />Ordinance <br /> <br />Amount Requested: $33,053.00 <br /> <br />Exhibits: <br /> <br />Chane:e Order # 2 <br /> <br />Budgeted Item: YES <br /> <br />Exhibits <br /> <br />SUMMARY & RECOMMENDATION <br /> <br />The Little Cedar Bayou Wastewater Treatment Plant Solids Handling Improvement Project is <br />substantially complete. Change Order # I previously adjusted the contract approved by an <br />additional $4,788 for replacement of electrical conduit previously specified to be reused, and the <br />addition of an eye wash and safety shower in the dewatering building. During final start-up of <br />major equipment, it was discovered that the Engineer had specified the wrong pumps and motors <br />for the polymer system for the new belt filter presses. The COITect equipment was identified and <br />ordered, and has recently been installed and tested. <br /> <br />The Engineer has prepared Change Order #2 in the amount of$33,053.00 to replace two (2) <br />previously installed polymer feed pumps, piping and associated controls and electrical <br />modifications. These changes are necessary to allow the two (2) new belt filter presses to <br />properly function. The City is contractually bound to pay the Contractor for the new installation. <br />However, we will be meeting with the Engineer to establish the value of the original installation, <br />looking to the Engineer to reimburse the City for these costs, as design eITor is at fault. These <br />costs will be withheld from the Engineer's final payment. <br /> <br />Action Reauired bv Council: Approve ordinance authorizing the City Manager to execute <br />Change Order No.2 in the amount of $33,053.00. <br /> <br /> <br />P ---Ii -tY! <br /> <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.