Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />#R 05-005 <br />P&Z 9/15/05 <br />Page 3 of6 <br /> <br />characterized by central management, common use of parking, detention, <br />maintenance of open spaces or other facilities, and efficient distribution of <br />various land uses. <br /> <br />The applicant looked at the second option of rezone to Planned Unit <br />Development (PUD). Using this scenario, the applicant is requesting to <br />rezone the property from BI & R-2 to PUD; where, existing use of the <br />facility is a permitted use and fencing would be allowed in accordance with <br />the applicable ordinances. <br /> <br />Analvsis: <br /> <br />The relationship of the applicant's proposal to the Land Use Plan and <br />Comprehensive Plan needs to be emphasized as much as possible. In <br />considering this request, Staff reviewed the following elements of the <br />Comprehensive Plan. . <br /> <br />Land Use - The City's Land Use Plan indicates this area developing with <br />commercial and industrial uses. Conformance of a zoning request with the <br />land use plan is one consideration among several criteria to be considered in <br />approving or denying a rezoning application. Other criteria may include: <br /> <br />. Character of the surrounding and adjacent areas; . <br />. Existing use of nearby properties, and extent to which a land use <br />classification would be in harmony with such existing uses or the <br />anticipated use of the properties; <br />. Suitability of the property for the uses to which would be permissible, <br />considering density, access and circulation, adequacy of public facilities <br />and services, and other considerations; <br />. Extent to which the designated use of the property would harm the value <br />of adjacent land use classifications; <br />. Extent to which the proposed use designation would adversely affect the <br />capacity or safety of that portion of the road network influenced by the <br />use; <br />. Extent to which the proposed use designation would permit excessive air <br />pollution, water pollution, noise pollution, or other environmental harm <br />on adjacent land use designations; and, <br />. The gain, if any, to the public health, safety, and welfare due to the <br />existence of the land use designation. <br /> <br />Facility Uses/Operations - Review of the City's Land Use Plan indicates <br />that this area is envisioned as a CommercialJIndustrial use. The first phase of <br />the present facility was completed in 1991. In the first phase, there is a large <br />cargo building with existing loading docks as well as a rail spur for the flow <br />