My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2005-1501-GGGG R05-001
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2005
>
O-2005-1501-GGGG R05-001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:16 PM
Creation date
10/26/2006 9:26:09 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
3/14/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />Rezone Request #R 05-001 <br />P&Z Feb 17, 2005 <br />Page 2 of2 <br /> <br />Transportation - Both tracts gain access using Farrington Boulevard, a <br />minor arterial with 100' ROW, which provides access to Fainnont Parkway <br />and Spencer Highway. However, Farrington Boulevard median cut and its <br />alignment with the access points of the proposed development will be <br />reviewed carefully at the time of plat submittal. Fainnont Parkway, a semi- <br />controlled access highway with 250' ROW, may accommodate the traffic <br />generated by this develop~ent. <br /> <br />Parks and Recreation - The nearest park facility is in Fainnont Park <br />Central Section 2 along Farrington Boulevard at Collingswood. This facility <br />serves the parks and recreation needs of several neighborhoods within a 1 to <br />2 mile radius. At the time of platting, attention should be given to pedestrian <br />connectivity. The subject tracts would provide the needed access to connect <br />Big Island Slough to the Exxon-Mobil Pipeline as mentioned in the City's <br />Bicycle and Pedestrian Implementation Plan. <br /> <br />Utilities - Sufficient water and sanitary sewer facilities exist in the area. <br />The detailed analysis will, occur when subdivision plats are submitted. In <br />addition, the developer must provide any structures or improvements <br />necessary to serve future development. Storm water drainage and detention <br />is also an issue that will be carefully reviewed as the project develops. Staff <br />recommends on-site detention for the proposed development. <br /> <br />Residential Development - The intent of the Comprehensive Plan is to <br />provide for attractive low-density residential neighborhoods. The <br />neighborhood protection standards applicable to this project may include <br />physical screening, increased setbacks, and use of open space buffers. When <br />reviewing the subdivision plat, the Commission may consider additional <br />buffering between land us~s, e.g. adjoining commercial uses along Fairmont <br />Parkway. <br /> <br />Conclusion: <br /> <br />At this time, Staff recommends that the Planning and Zoning Commission <br />approve this rezone request, as it represents the highest and best use of the <br />property. Furthermore, the request supports the goals and objectives of the <br />Comprehensive Plan. <br /> <br />Actions available to the Commission are as follows: <br /> <br />. Recommend approval of the zone change from GC to R-1, as <br />requested, , <br />. Recommend denial of the zone change from GC to R -1, and <br />. Continue the public hearing until next meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.