My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2005-1501-DDDD scup05-001
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2005
>
O-2005-1501-DDDD scup05-001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:16 PM
Creation date
10/26/2006 9:28:20 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
2/14/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />e <br /> <br />City of La Porte <br />Special Conditional Use Permit # SCU 05-001 <br /> <br />This permit is issued to: <br /> <br />DNV Petroleum Services. Inc. (Hauk Wahl) <br />Owner or Agent <br /> <br />318 N. 16th Street. La Porte TX 77571 <br />Address <br /> <br />For Development of: <br /> <br />Parkina Lot (Off-site) expansion <br />Development Name <br /> <br />318 N. 16th Street. La Porte <br />Address . <br /> <br />Legal Description: <br /> <br />Pt. Lots 13-16. Block 652. Town of La Porte <br />La Porte. Harris County. Texas. <br /> <br />Zoning: <br /> <br />Liaht Industrial (L1) <br /> <br />Use: <br /> <br />Parkina Lot <br /> <br />Permit Conditions: <br /> <br />1. SCUP#05-00 I is specifically limited to the off-site parking. <br />2. Screening and landscaping of the parking lot must be provided by the owner/developer in accordance with <br />Section 106-444(a) of the Ordinances. The landscaping should be a mixture of trees and sight bearing bushes <br />(e.g. red tips or oleanders). The landscaping plan must be approved by the City Staff. <br />3. Principal use depends upon off-site parking shall maintain the minimum number of required parking spaces. <br />4. The paved area provides a dust-free environment, the construction of which be approved by the City Staff. <br />5. At least 50' of the West Tyler Street shall be improved as described in the City's PICM; i.e. concrete, curb, <br />and gutters. <br />6. Drainage to be planned to have a net zero effect for stormwater runoff for surrounding areas and mitigate any <br />sheet flow or drainage corridor issues to the satisfaction of the City Staff. <br />7. This permit does not become valid until a formal Minor Development Site Plan is submitted to the City; <br />reviewed and approved in accordance with the requirements of the Development Ordinance. <br />8. A properly drawn legal instrument, duly approved by the City Attorney, shall be filed with the City Secretary. <br />9. A certificate of occupancy, renewable annually, shall be required. <br />10. The Developer shall comply with all applicable laws and ordinances of the City and the State of Texas. <br /> <br />Failure to begin construction within 12 months after issuance or as scheduled under the terms of a special <br />conditional use permit shall void the permit as approved, except upon an extension of time granted after <br />application to the Planning and Zoning Commission. <br /> <br />If construction is terminated after completion of any stage and there is ample evidence that further development is <br />not contemplated, the ordinance establishing such special conditional use permit may be rescinded by the City <br />Council, upon its own motion or upon the recommendation of the Planning and Zoning Commission of the City of La <br />Porte, and the previous zoning of the entire tract shall be in full effect on the portion which is undeveloped. <br /> <br /> <br />~JiJ.4J ., '11f . JJd1.ti1 <br />City Secreta <br /> <br />~M1R~\l1r F . <br />
The URL can be used to link to this page
Your browser does not support the video tag.