My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2004-2755 TABLED
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2004
>
O-2004-2755 TABLED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:14 PM
Creation date
10/30/2006 12:49:33 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
6/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />pipeline that has been permitted in accordance <br />with this Article. <br /> <br />2. All known abandoned pipelines shall be <br />purged, disconnected from all sources or <br />suppliers of gas, hazardous liquids and <br />chemicals and shall be capped or sealed at each <br />end within the City limits. <br /> <br />Sec. 102-241. Construction Requirements <br /> <br />All pipelines shall be constructed in accordance with <br />the following guidelines: <br /> <br />(a) All pipelines shall be constructed in accordance <br />with the latest applicable minimum standards, if <br />applicable, established by the United States <br />department of Transportation, Texas Railroad <br />Commission, or any other entity having regulatory <br />authority over pipeline safety and construction <br />matters. <br /> <br />(b) All pipelines shall be buried to specified <br />depths, as follows: <br /> <br />1. Pipelines which run under or within twenty (20) <br />feet of any street or streets and/or any <br />proposed street which has been designated on <br />the Master Plan for the City or the official <br />Ci ty Map of the City, shall be buried to a <br />depth of at least six (6) feet measured between <br />the top of the pipeline and the natural surface <br />of the ground. <br /> <br />2. Pipelines which run under any ditch and/or <br />drainage area or structure shall be buried to a <br />depth of at least five (5) feet measured <br />between the top of the pipeline and the <br />ultimate channel or structure depth. Permittee <br />is responsible for determining the ultimate <br />depths from the appropriate agency and <br />reporting said information with permit <br />application. <br /> <br />3. Pipelines for areas not mentioned in 1. or 2. <br />above shall be buried to a minimum depth of <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.