Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />"DRAFT" <br /> <br />City of La Porte <br />Special Conditional Use Permit # SCU 04-004 <br /> <br />This permit is issued to: <br /> <br />Lloyd and Linda Duncan <br />Owner or Agent <br /> <br />1822 Gaucho Circle. La Porte. TX 77571 <br />Address <br /> <br />For Development of: <br /> <br />Underwood Self Storaae (Miniwarehousina) <br />Development Name <br /> <br />2619 Underwood Road. La Porte <br />Address <br /> <br />Legal Description: <br /> <br />Lot 10.Block 2. W. J. Payne Subdivision <br />La Porte. Harris County. Texas. <br /> <br />Zoning: <br /> <br />General Commercial (GC) <br /> <br />Use: <br /> <br />Mini-storaaelWarehousina <br /> <br />Permit Conditions: <br /> <br />1. SCUP#04-004 is specifically limited to the mini-storage/warehouse as defined in SIC. #4225. <br />2. Development abutting "R-l" district shall be screened and landscaped in compliance with required <br />screening and landscaping provisions per Section 1 06-444(a) of the Ordinance. <br />3. Provide at least 20' wide planting strip for heavy landscaping abutting residential development in the <br />rear. All landscaping and screening shall be maintained by the owner/developer. <br />4. Additional landscaping should be provided along the entire front and both sides for a depth of at least 60'. <br />5. Enhance the building fa~ade so that it blends with the existing commercial to be architecturally and <br />aesthetically pleasing. <br />6. Utility extension or paved area over pipeline easement will be the responsibility of the owner/developer. <br />7. All non-service transmission pipeline crossing must have the approval of the pipeline company. <br />8. Ensure that maximum lot coverage does not exceed 40%. <br />9. Provide on-site detention for the development <br />10. This permit does not become valid until a fonnal Minor Development Site Plan is submitted to the City; <br />reviewed and approved in accordance with the requirements of the Development Ordinance. <br />11. The Developer shall comply with all applicable laws and ordinances of the City and the State of Texas. <br /> <br />Failure to begin construction within 12 months after issuance or as scheduled under the terms of a special <br />conditional use permit shall void the permit as approved, except upon an extension of time granted after <br />application to the Planning and Zoning Commission. <br /> <br />If construction is terminated after completion of any stage and there is ample evidence that further development is <br />not contemplated, the ordinance establishing such special conditional use permit may be rescinded by the City <br />Council, upon its own motion or upon the recommendation of the Planning and Zoning Commission of the City of La <br />Porte, and the previous zoning of the entire tract shall be in full effect on the portion which is undeveloped. <br /> <br />Validation Date: <br /> <br />ordi n~ nLL Pet ;/r1 "'5(J()J d/ <br /> <br />Director of Planning <br /> <br />City Secretary <br /> <br />~'BIT F . <br />