My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2003-1501-FFF R03-006
LaPorte
>
.Ordinances
>
2000's
>
2003
>
O-2003-1501-FFF R03-006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:10 PM
Creation date
10/30/2006 2:02:30 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
11/8/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />. . <br />CLAUNCH & MILLER, INC. <br />Engineering Consultants <br /> <br />ATTACHMENT "A" <br /> <br />October 29, 2003 <br /> <br />Mr. Stephen L. Gillett <br />Director of Public Works <br />City of La Porte <br />P.O. Box 1115 <br />La Porte, TX 77572-1115 <br /> <br />RE: Engineering Services for the 2004 Waterline Improvements <br /> <br />Dear Mr. Gillett: <br /> <br />Claunch & Miller, Inc. (CM!) is pleased to submit this proposal for providing engineering services on <br />the above referenced project. <br /> <br />DESCRIPTION OF PROJECT <br /> <br />2004 Water Line Improvement Proiect <br /> <br />The project consists of water line improvements as follows: <br /> <br />Rustic Gate Street- This improvement consists of replacing the existing 12" AC water line with <br />a new 12" PVC water line along the north side of Rustic Gate Street from Farrington Blvd. to <br />Old Hickory Drive (approximately 1,300'). This project also includes the replacement of all the <br />existing sidewalk on the north side of Rustic Gate in this area. <br /> <br />K Street IDeht ofWav - This improvement consists of installing a new 12" water line from SH <br />146 to South 8th Street. This line will provide a new connection loop to the existing 16"water <br />line along SH 146 to replace the connection at Fairmont Parkway that was abandoned as part of a <br />. . <br />preVIOUS repaIr. <br /> <br />Fairmont Parkwav Relocation - This improvement consists of relocating a portion <br />(approximately 1,000') of the existing 16" La Porte Area Water Authority Surface Water Supply <br />Transmission Line. The section to be relocated is between the Southern Pacific Railroad right of <br />way and 16th Street. <br /> <br />The preliminary estimated construction cost for the water line improvements is $262,000.00. <br /> <br />Page 1 of9 <br /> <br />4635 Southwest Freeway, Suite 1000 · Houston, Texas 77027-7169 · 713-622-9264 · Fax 713-622-9265 <br />
The URL can be used to link to this page
Your browser does not support the video tag.