Laserfiche WebLink
<br />-.---;- -.---------,." --.....; <br />; '1- :..-::::::::;=---::::;::::::;-;:. ! <br />. /-: -'\ <) /! '../ <br />. \ J. '.,I' /. . <br />:~.~'~~:::~. .-J _~l= . <br /> <br />e <br /> <br />e <br /> <br />Preliminary Phase Special Services <br /> <br />Field Survey Services <br /> <br />· Obtain full topographical survey for the full right of way for Rustic Gate Street from <br />Farrington Blvd. to Old Hickory Drive (approximately 1,350'). Survey will also extend <br />100' along streets intersecting streets. The approximate length of survey for the entire <br />project is 1,950 feet. Vertical elevation information will be based on the City of La Porte <br />datum. <br /> <br />· Obtain full topographical survey for the south half of the Fairmont Parkway Right of <br />Way from the Southern Pacific Railroad east to the 16th Street intersection. The <br />approximate length of survey for the entire project is 1000 feet. Vertical elevation <br />information will be based on the City of La Porte. <br /> <br />· Obtain full topographical survey for the full right of way for K Street from SH 146 to 8th <br />Street. A portion of this area was obtained previously. It is estimated that an additional <br />350' will be needed to complete the survey of this section. <br /> <br />· The survey shall locate right-of-way iron rods and property comers at periodic locations <br />to provide an indication of the right-of-way. <br /> <br />· Perform ''measure downs" and provide vertical elevation information on the existing <br />sanitary sewer, storm sewer, and other utilities in the project area. <br /> <br />· Perform cross sections at approximate intervals of 50'. Such cross sections shall be the <br />full width of the right-of-way except as noted. <br /> <br />· This scope does not include survey services associated with right of way mapping or <br />acquiring right of way. <br /> <br />Geotechnical Investigation Services <br /> <br />· Provide a geotechnical report presenting an investigation of the soils at the Rustic Gate <br />project location, Fairmont Parkway and 16th Street project location and State Highway <br />146 project location. <br /> <br />The geotechnical report will provide usual and customary information on the existing <br />soil. It will include bedding and backfill recommendations, trench safety information. <br />The report will be based upon information obtained from three borings along Rustic Gate, <br />two along Fairmont Parkway each approximately ten (10) feet deep and one along K <br />Street approximately 25ft. <br /> <br />Page 3 of9 <br />