My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2003-1501-FFF R03-006
LaPorte
>
.Ordinances
>
2000's
>
2003
>
O-2003-1501-FFF R03-006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:10 PM
Creation date
10/30/2006 2:02:30 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
11/8/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />j---'" ..-~...--- : ~ ~_." <br /> <br />e <br /> <br />e <br /> <br />-- ---- _.~--"- <br />: ;/::'~~:;'::~-'/~ <br />'. 1/>..\' ''v'j <br />: ~-~~_-..:~:~~~~. , <br /> <br />FEE SCHEDULE <br /> <br />DESIGN PHASE SERVICES <br /> <br />Preliminary Design <br /> <br />Basic Services (Lump Sum Amount) <br /> <br />$ 4,775.00 <br /> <br />Special Services: <br />*Survey (Cost plus 10%) <br />**Geotechnical Investigation (Cost plus 10%) <br /> <br />$ 6,250.00 <br />$ 3,300.00 <br /> <br />Final Design <br /> <br />Basic Services (Lump Sum Amount) <br /> <br />$19,650.00 <br /> <br />CONSTRUCTION PHASE SERVICES <br /> <br />*Engineering Services during the Bidding and <br />Construction Phase (Hourly and Cost plus 10%) <br /> <br />$ 4,925.00 <br /> <br />TOTAL AMOUNT <br /> <br />$38,900.00 <br /> <br />*These figures are budgetary based on estimated man-hours to perform the scope of services and may <br />increase or decrease depending upon actual work required. If an increase becomes necessary it can be <br />accomplished by utilizing available funds from other line items that have under run, or by contract <br />amendment. <br /> <br />**The estimated costs for the Geotechnical services are based on performing all the areas at one time <br />and combined within a single report. <br /> <br />Claunch & Miller, Inc. will submit monthly progress invoices for all work completed to invoice date. <br />The total contract authorization amount is not-to-exceed $38,900.00. <br /> <br />Time and materials charges and additional services beyond those described in the Scope of Services will <br />be invoiced on the basis of direct labor costs times a factor of 2.99 and direct cost plus 10%. No <br />additional services will be performed or invoiced without prior authorization form the City of La Porte. <br /> <br />Page 8 of9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.