My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2003-2648
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2003
>
O-2003-2648
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:11 PM
Creation date
10/30/2006 3:43:08 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
8/11/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />REQUEST FOR CITY COUNCIL AGENDA ITEM <br /> <br />Agenda Date Requested: AU'U<i:r~: <br />Requested By: S. Gillett ~ <br />Department: Public Works <br /> <br />Appropriation <br /> <br />Source of Funds: Utility elF Fund 3 <br /> <br />Account Number: 003-9890-881-1100 <br /> <br />Report: <br /> <br />Resolution: <br /> <br />Ordinance: XX <br /> <br />Amount Budgeted: $2R2,269 <br /> <br />Exhibits: <br /> <br />Ordinance <br /> <br />Amount Requested: $229,686 <br /> <br />Exhibits: <br /> <br />Eneineer's Recommendation <br /> <br />Budgeted Item: YES <br /> <br />Exhibits: <br /> <br />Rid Tflhulation <br /> <br />The FY 2002-2003 Utility ClP Fund includes two (2) waterline replacement projects that were <br />designed and bid as one project - Carlow Lane Waterline Replacement Project and East E Street at <br />Deer Creek Waterline Replacement Project. The Project, designed by Claunch & Miller, Inc., <br />received bids on July 28, 2003, with seven (7) bids received. Low bid was submitted by Southern <br />Customs, Inc. in the amount of $187,826.80. Second low bid is from R.L. Utilities, Inc. in the <br />amount of $218,749.00. Completion date is 90 days after receipt of notice to proceed. A total of <br />$282,269.00 was budgeted for construction of this Project. <br /> <br />As illustrated by the attached bid tabulation, the bids ranged from a high of $330,035 to the low <br />bid. Southern Customs, low bidder, proposed to subcontract the waterline portion of the Project, <br />which represents 58.6% of the bid. Section 4.01 of the General Conditions of the Contract <br />Documents state "Under no conditions shall the Contractor sublet more than 50% of the work <br />under this Contract". The waterline replacement is the primary reason for the Project. The <br />sidewalks and driveways must be removed and replaced to install the waterline. It is critical that <br />an experienced waterline contractor install public water systems, to protect the public health. <br />Southern Customs submitted a list of projects completed, with good references, but has no <br />documented experience in potable water system installation. The proposed subcontractor <br />submitted references that were positive, but were not of comparable size or for public water <br />sY:items. <br /> <br />Second low bidder, R.L. Utilities, provided a list of nine waterline projects of comparable size, <br />with good references, and is recommended by the Engineer for the bid award. <br /> <br />Action Required by Council: Approve an Ordinance authorizing the City Manager to execute a <br />contract with R. L. Utilities, Inc. in the amount of $218,749.00 for the construction of the Project. <br />Additionally, authorize $10,937.00 for contingency. <br /> <br /> <br />?./5-d3 <br /> <br />Dnte <br />
The URL can be used to link to this page
Your browser does not support the video tag.