Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Ordinance No. 2003 - 2641 <br /> <br />Page 2 <br /> <br />Section 1: That Appendix A, Chapter 82, "Buildings and Building <br />Regulations," Article II, "Building Code Permit Fee Schedule," of the Code of <br />Ordinances, La Porte, Texas, is hereby amended to read as follows: <br /> <br />BUILDING PERMITS <br /> <br />Total Valuation <br /> <br />Fee <br /> <br />$1,000. and less <br /> <br />$20.00 <br /> <br />$1,001 to $50,000 <br /> <br />$20.00 for the first $1,000 plus $7.50 <br />for each additional thousand or fraction <br />thereof, to and including $50,000 <br /> <br />$50,001 to $100,000 <br /> <br />$387.50 for the first $50,000 plus <br />$6.00 for each additional thousand or <br />fraction thereof, to and including <br />$100,000 <br /> <br />$687.50 for the first $100,000 plus <br />$4.50 for each additional thousand or <br />fraction thereof, to and including <br />$500,000 <br /> <br />$2,487.50 for the first $500,000 plus <br />$3.50 for each additional thousand or <br />fraction thereof <br /> <br />$100,001 to $500,000 <br /> <br />$500,001 and up <br /> <br />RE-INSPECTION FEE <br /> <br />$20.00 <br /> <br />MOVING FEE <br /> <br />For the moving of any building or structure: <br /> <br />$150.00 <br /> <br />DEMOLITION FEE <br /> <br />For the demolition of any building or structure: <br />Plus: Property Owner, Refundable Cash Bond <br />Contractor, Refundable Cash Bond <br /> <br />$ 75.00 (Non-refundable) <br />$250.00 (Refundable) <br />$500.00 (Refundable) <br /> <br />PENALTIES <br /> <br />When is work is started without the required permit, the fee herein specified shall be doubled. <br />The payment of such double fee shall not relieve any persons from fully complying with the <br />requirements in the execution of the work nor from any other applicable penalties. <br />