Laserfiche WebLink
<br />e e <br /> <br />Ordinance No. 2003 - 2641 Page 8 <br /> <br /> For the installation or relocation of each boiler or compressor <br /> over fifty (50) horsepower (37.3 kW), or for each absorption <br /> system over 1,750,000 BtuIh (512.66 kW) $52.50 <br />5) Air Handlers <br /> For each air-handling unit to and including 10,000 cfm <br /> (4.72 m3 IS), including ducts attached thereto $5.00 <br /> Note: This fee shall not apply to an air-handling unit which <br /> is a portion of a factory-assembled appliance, cooling unit, <br /> evaporative cooler or absorption unit for which a permit is <br /> required elsewhere in this code. <br />6) Evaporative Coolers <br /> For each air-handling unit over 10,000 cfm (4.72 m3/S) $10.00 <br /> For each evaporative cooler other than portable type $ 5.00 <br />7) Ventilation and Exhaust <br /> For each ventilation fan connected to a single duct $2.50 <br /> For each ventilation system which is not a portion of any <br /> heating or air conditioning system authorized by a permit $ 5.00 <br /> For the installation of each hood which is served by <br /> Mechanical exhaust, including the ducts for such hood $ 5.00 <br />8) Incinerators <br /> For the installation or relocation of each domestic-type <br /> incinerator $10.00 <br /> <br />For the installation or relocation of each commercial or <br />industrial -type incinerator $20.00 <br /> <br />9) <br /> <br />Miscellaneous <br />For each appliance or piece of equipment regulated by this <br />Code, but not classed in other appliance categories, or for <br />which no other fee is listed in this table <br /> <br />$ 5.00 <br />