Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />C. <br /> <br />Application for Waste Control <br />Permit (if required) made no later than <br />after Public Hearing notice for Facility <br />Plan is issued. <br /> <br />cornol eted days <br /> <br />.. <br /> <br />D. Final Environmental Assessment and <br />Facility Plan (including time for draft <br />reports, advertisement & hearing) <br />completed and submitted to the State <br />after Step 1 grant award. <br /> <br />camp 1 eted days <br /> <br />STEP 2 <br /> <br />A. User Charge System and Industrial <br />Cost Recovery System (if required) <br />developed and submitted to the State <br />after Step 2 grant a~ard. <br /> <br />90 <br /> <br />days <br /> <br />.' <br /> <br />B. <br /> <br />Preliminary Plan of Operation (if required) <br />completed and submitted to the State <br />after Step 2 grant award. <br /> <br />30 <br /> <br />days <br /> <br />C. Final Plans and Specifications, <br />completed and submitted to State <br />after Step 2 grant award. <br /> <br />270 <br /> <br />days <br /> <br /> STEP 3 <br /> A. Advertise for Construction Bids within 45 days <br /> after authorization to advertise for <br /> bids has been issued. <br /> B. Submit Bid Opening Documents within 30 days <br /> after authorization to advertise for <br /> bids has been issued. <br />- C. Award of Construction Contract within 7 days <br /> after authorization to award the contract <br /> has been issued. <br /> D. Initiation of Construction within 30 days <br /> after the award of the contract. <br /> <br />TDWR-0570 <br />Page 2 of 2 <br />