Laserfiche WebLink
<br />1. PASADENA and LA PORTE hereby, through their respective City Councils <br />adopt the Preamble hereof. <br /> <br />2. The parties understand and agree that the sports complex is planned to be located <br />on property owned by PASADENA described in the general Warranty Deed <br />attached hereto as Exhibit "A" and incorporated herein for all purposes and that <br />this agreement is subject to all conditions and restrictions contained therein. The <br />parties have had the opportunity to examine the property and all conditions <br />thereon and agree that it is taken "as is". <br /> <br />Article I <br />DESIGN <br /> <br />1.1 After execution of this Agreement and as soon as possible thereafter, <br />PASADENA and LA PORTE will designate representatives who will approve the <br />selection of an architectural design firm suitable to both PASADENA and LA <br />PORTE, in a manner similar to other PASADENA projects. <br /> <br />1.2 The Mayor of Pasadena may appoint an architectural design firm to develop all <br />necessary renderings, schematics, specifications, and details, and Pasadena will <br />enter into a contract with said architectural design firm. <br /> <br />1.3 PASADENA and LA PORTE agree that the Joint Sports Complex <br />ArchitecturalDesign Contract will be administered by PASADENA, and that each <br />party will provide total respective funding based on percentage participation as <br />described herein. <br /> <br />1.4 Within the time specified in the Joint Sports Complex Design Contract, <br />representatives of PASADENA and LA PORTE shall approve plan sets by <br />signature, in 50%, 75% and 100% iterations, resulting in prepared drawings and <br />specifications for the Joint Sports Complex, with copies of same to <br />PASADENA and LA PORTE for written approval by the respective City <br />Engineers, or designees. <br /> <br />1.5 PASADENA is willing to contribute 60% and LA PORTE is willing to contribute <br />40% of the total cost of design of project. These amounts are based on the <br />general plan of construction and operation of fields for Pasadena and fields for La <br />Porte and respective amenities generally described herein at Exhibit "B". The <br />cost of the design will be an amount agreed upon by both parties. <br /> <br />Pasadena-La Porte Sports Complex lnterlocal Agreement, 0407.doc <br /> <br />Page 2 of7 <br />