My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2007-2975 construct 18-Inch pipeline for transportation of natural gas liquids
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2007
>
O-2007-2975 construct 18-Inch pipeline for transportation of natural gas liquids
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:21 PM
Creation date
5/8/2007 12:15:53 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
3/19/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />City of La Porte - Planning Department <br />604 West Fairmont Parkway <br />La Porte, Texas 77571 <br /> <br />Phone: (281) 471-5020 - Fax: (281) 470-5005 <br />www.laportetx.gov <br /> <br />March 21, 2007 <br /> <br />Enterprise GC, L.P. <br />P.O. Box 4324 <br />Houston, TX 77210-4324 <br />Attn.: Kyle L. Webster, R-O- W Manager <br /> <br />RE: Pipeline Transportation Permit (PT-2007-001) <br /> <br />Dear Mr. Webster, <br /> <br />Your application for a pennit to construct an 18" diameter natural gas liquids pipeline within the city limits of La <br />Porte was approved by La Porte City Council at its March 19, 2007 meeting. You are hereby authorized to begin <br />construction within all regulations set forth in City of La Porte Ordinance 2004-2755: <br /> <br />Please note the following: <br /> <br />1. Contact the City of La Porte Planning Department at (281) 470-5059 no less than 48 hours prior to <br />commencement of construction. <br /> <br />2. Post copies of Penn it at all public right-of-way crossings. <br /> <br />3. Per Sec. 102-235, Item (k) of Ordinance 2004-2755: ''the Pennittee shall, at any time in the future, where <br />such pipeline or portion thereof crosses or is laid within, under or across any street, road or utility right-of- <br />way, drainage way or public way existing or projected at the time the pennit is issued, reposition such <br />pipeline (which shall include lowering or raising the pipeline, as well as casing it, if required) at the <br />Pennittee's sole expense, when the City reasonably requires such action incidental to public construction or <br />public improvement: construction, maintenance and improvement of streets, water lines, sanitary sewer <br />lines, stonn sewers, ditches and public utilities. The City shall give the Pennittee prior written notice of the <br />need for repositioning location, and such notice shall bemailedcertifiedmail.returnreceiptrequested.to <br />the Pennittee as designated in the application. The Pennittee shall have six (6) months to complete such <br />repositioning. <br /> <br />3)rL <br />VVayneJ.Sabo ~ <br />Planning Director <br /> <br />cc: Finance Department <br />Planning Department Pennit File <br />
The URL can be used to link to this page
Your browser does not support the video tag.