Laserfiche WebLink
<br />The pipeline will be regulated by the Texas Railroad Commission as an Intrastate <br />Pipeline. All design, materials and construction will, as a minimum, comply with the <br />following codes, ordinances and standards as applicable: <br /> <br />. The Department of Transportation ("DOT") Standard CFR Title 49, Part 195 <br />"Transportation of Hazardous Liquids by Pipeline", and The "Railroad <br />Commission of Texas, Pipeline Safety Rules, Part IV <br /> <br />. ASME B31.8. "Gas Transmission and Distribution Piping Systems, <br /> <br />. U.S. Department of Labor Regulations Title 29, CFR 1910 and 1925, <br />"Occupational Safety and Health Standards", <br /> <br />. API 1104, "Standard for Welding Pipelines and Related Facilities". <br /> <br />ENTERPRISE GC, L.P. hereby makes this statement, that it agrees to the conditions and <br />obligations set out in ORDINANCE NO. 2004 - of the City of La Porte Pipeline <br />Ordinance; Section 1; Article IV. Pipeline Transportation, Sec 102-235 Application for <br />Permit 3 G), 3 (k), and 3 (I), and all sections thereof that apply, regardless if said <br />section(s) are specifically mentioned in this letter. <br /> <br />The anticipated construction start date is scheduled to begin by March 31, 2007. <br /> <br />Also enclosed herewith is a check in the amount of $ 1,000.00 for initial permit fee and <br />the appropriate insurance certificate. If additional information is required, please contact <br />Allen Wagers, at (713) 644-3219 or 713-898-5551. <br /> <br />Thank you in advance for your prompt attention to this matter. <br /> <br />Sincerely, <br /> <br />~d~ <br /> <br />Allen Wagers, Manager <br />Land & Right of Way Department <br />