Laserfiche WebLink
<br /> <br />City of La Porte - Planning Department <br />604 West Fairmont Parkway <br />La Porte, Texas 77571 <br /> <br />Phone: (281) 471-5020 - Fax: (281) 470-5005 <br />www.laportetx.gov <br /> <br />March 21, 2007 <br /> <br />Enterprise GC, L.P. <br />P.O. Box 4324 <br />Houston, TX 77210-4324 <br />Attn.: Kyle L. Webster, R-O- W Manager <br /> <br />RE: Pipeline Transportation Permit (PT -2007-002) <br /> <br />Dear Mr. Webster, <br /> <br />Your application for a permit to construct an 12.750" diameter natural gas liquids pipeline within the city limits of <br />La Porte was approved by La Porte City Council at its March 19,2007 meeting. You are hereby authorized to begin <br />construction within all regulations set forth in City of La Porte Ordinance 2004-2755: <br /> <br />Please note the following: <br /> <br />1. Contact the City of La Porte Planning Department at (281) 470-5059 no less than 48 hours prior to <br />commencement of construction. <br /> <br />2. Post copies of Permit at all public right-of-way crossings. <br /> <br />3. Per Sec. 102-235, Item (k) of Ordinance 2004-2755: "the Permittee shall, at any time in the future, where <br />such pipeline or portion thereof crosses or is laid within, under or across any street, road or utility right-of- <br />way, drainage way or public way existing or projected at the time the permit is issued, reposition such <br />pipeline (which shall include lowering or raising the pipeline, as well as casing it, if required) at the <br />Permittee's sole expense, when the City reasonably requires such action incidental to public construction or <br />public improvement: construction, maintenance and improvement of streets, water lines, sanitary sewer <br />lines, storm sewers, ditches and public utilities. The City shall give the Permittee prior written notice of the <br />need for repositioning location, and such notice shall be mailed certified mail, return receipt requested, to <br />the Permittee as designated in the application. The Permittee shall have six (6) months to complete such <br />repositioning. <br /> <br />WcJ)L <br /> <br /> <br />Wayne J. Sabo <br />Planning Director <br /> <br />cc: Finance Department <br />Planning Department Permit File <br />