Laserfiche WebLink
<br />City of LaPorle . Fonlt <br />;'.2 S~plClIIlbcl' 2006 <br />Page Two <br /> <br />The scope dO$$ not include the following services; however, jf required Effective <br />Environmental, Inc. will provide them under a separate Scope of Work. Services not <br />included in this scope of work inclUde but are not limited to the following: <br />1. Groundwater sampling and analysis <br />2. Pumping of the pond to prepare and maintain the work area <br />3. $Qlidification of the material in any way <br />4. Removal, transportation and disposal of hazardous wastes <br />5. Additional site-work of any kind <br /> <br />If the above services become necessary during the course of this scope, the client will <br />be notified at the point in which Effective Environmental. Inc. is required to complete <br />such services. However, based on the information obtained to date, we feel that the <br />proposed scope is sufficient to successfully. remediate the area, <br /> <br />TERMS AND COMPENSATION <br /> <br />The volume estimates used to derive the base price were provided by the City. <br />They are as follows: <br /> <br />· Excavate contaIninated sediment and soil; est.220 cy in place <br />· Load, tra..nsport and dispose of Class II soil; est. 300 cy removed <br />· Sample for Ph to determine disposal options and stopping point <br />· Purchase, transport and place clean, select fill; 0 cy <br />· Mob/ demob, visqueen, misc. materials, etc. for yardage above <br />· Prepare waste profiles, manifests, labels, transport / dispoSal <br />· Document the activities <br /> <br />We have been assured by City personnel that the pond will be dry and suitable for placement of a <br />wide-track dozer. Our plan and pricing is predicated upon the fact that upon arrival we can place <br />the doze! in the pond to push the material into the SW comer. An ~cava:tor will then be utilized <br />to remove the sediment from the pond and place it directly into transport trucks. The same <br />procedure will be followed for the ditch cleaning process. <br /> <br />If conditions at the site do not confonn to the plan above. we ma.y be forced to employ a long- <br />stick excavator, pumping, drying and mixing activities to prop~rly complete the work. As <br />always, the City will have the option to utilize its own equipment and labor resOUrces to assist. <br /> <br />. .. Continued <br /> <br />3 <br /> <br />S/!7:d <br /> <br />S00S0Lbl82:01 <br /> <br />:wo~~ 2S:8l 9002-22-d3S <br />