My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2007-1501-V5 scup07-004
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2007
>
O-2007-1501-V5 scup07-004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:21 PM
Creation date
6/28/2007 12:27:50 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
5/21/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />This permit is issued to: <br /> <br />For Development of: <br /> <br />Legal Description: <br /> <br />Zoning: <br /> <br />Use: <br /> <br />Permit Conditions: <br /> <br />City of La Porte <br />Special Conditional Use Permit # SCU 07-004 <br /> <br />65 La Porte Ltd. (Arete Real Estate and Development Co.) <br />Owners <br /> <br />340 N Sam Houston Parkway East. Suite#140 Houston. TX 77060 <br />Address <br /> <br />Prooosed Lakes at Fairmont Greens. Section 9 <br />Development Name <br /> <br />Located at SH 146 north of McCabe Road <br />Address <br /> <br />20 acres of land being located in the W.P. Harris Survey. A-30 <br />City of La Porte. Harris County. Texas <br /> <br />Planned Unit Develooment (PUO) <br /> <br />SinQle-familv residential (Soecial Lot Line) <br /> <br />1. The development is restricted to 108 units based on single-family residential <br />special lot line parameters in the City's Code of Ordinances Section 106-333. <br />2. The Developer's Agreement shall determine driveway access on S.H. 146 must <br />be approved by TxDOT. <br />3. Building setbacks of 15'in lieu of 20' along public street rights-of-way and lot <br />areas of 4,000 sq. ft. <br />4. Lot coverage may range from 55% to 59%. <br />5. Any further redesign of the current layout of street rights-of-way, lot <br />configuration and building setbacks for this section require prior approval by <br />the Director of Planning. <br />6. Future approval of the plats and construction drawings will need to be in <br />accordance with the master sewer plan for south La Porte or agreed <br />modifications. <br />7. This project and the General Plan will need to conform to the priniciples and <br />findings of the Taylor Bayou Watershed Plan. <br />8. The City's Parkland dedications will not apply. Park/open space areas will be <br />included in the protective covenenats and restrictions that these areas, <br />structures, lawns, open spaces and appropriate adjacent lands are private and <br />maintenance would be the responsibility of the PID and/or Homeowner <br />Association. <br />9. The perimeter landscaping, pedestrian paths, sidewalks and the drainage system <br />for Section 9 will be consistent with standards proposed for the Lakes at <br />Fairmont Greens Subdivision. <br />10. Construct a sound barrier wall and perimeter fencing along with landscaping/open <br />space consistent with the standards as stated in SCU#04-012; fmal plans to be <br />approved by the City. <br />11. Ensure pedstrian access to trails system from within the development without <br />entering McCabe Road right-of-way or SH 146. <br />
The URL can be used to link to this page
Your browser does not support the video tag.