Laserfiche WebLink
<br />, <br />. <br /> <br />,I <br /> <br />;1 <br /> <br />'Ii ;7, <br /> <br />f <br />.1 <br /> <br />1: :~~;~~a:~e ~~~~:TE hereby, through their respective City aj10unCilS <br /> <br /> <br />2. The parties understand and ~gre,e that the sports complex is planned to be located <br />on property owned by PASADENA described in the general Warran 'y Deed <br />attached hereto as Exhibit "A" and incorporated herein for all pwposes Jnd that <br />. this agreement is subject to' all conditions and restrictions contained therdin. The <br />parties have had the opportunity ~o examine the property and all cohditions <br />.thereon and 'agree that it is ~en "as is", <br /> <br />Article I <br />DESIGN <br /> <br />After execution of this . Agreement and as soon as possible thereafter, <br />PASADENA and LA PORTE will designate representatives w~o will app~ove the <br />selection of an architectural design firm suitable to both PASADENA and LA <br />PORTE, in a manner similar to other PASADENA projects. ' <br /> <br />The Mayor of Pasadena may appoint an architectural design firm to develop all <br />. .. necessary renderings, schematics, specifications, and details, and Pasadbna will <br />enter into a contract with said architectural design firm, I- <br /> <br />. PASADENA and LA ~ORTE agree that the Joint Sports ~omplex <br />ArchitecturalDesign Contract will be administered by PASADENA, and that each <br />party will provide total reSpective funding based on percentage particiJ,ation as <br />described herein. " 'I <br /> <br />,'Within the time specifi~ in the 'Joint Sports Complex Design d:ontract, <br />representatives of PASADENA and LA PORTE shall approve plan I sets by <br />signature, in 50%, 75% and 100% iterations, resulting in prepared drawings and <br />specifications for the, Joint Sports Complex, with copies of ~ame to <br />PASADENA and LA PORTE for written approval by the respective City <br />Engineers, or designees. <br /> <br />1'.1 <br /> <br />1.2 <br /> <br />1.3 <br /> <br />1.4 <br /> <br />PASADENA is willing to 90ntribute 60% and LA PORTE is willing to contribute <br />, 40% of the total cost of design of project. These amounts are based on the <br />· general plan of constructio~ and operation of fields for Pasadena and fiel~s for La <br />Porte and respective amenities generally described herein at Exhibit "B", The <br />cost of the design will be' an amount agreed upon by both parties. <br />'; <br />, <br /> <br />1.5 <br /> <br />Pasadena- Pasadena-La Porte Sports Co~lex InterlocaI Agreement, 0407.doc <br /> <br />Page 2 of7 <br />