My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2004-2717
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2004
>
O-2004-2717
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:13 PM
Creation date
7/12/2007 5:14:33 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
4/26/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mr. John Joems <br />April 7, 2004 <br />Page 4 of6 <br /> <br />As requested, we added provisions for a drainage analysis of drainage problems/rectification on <br />Driftwood ($4,330). In addition, we have included a proposal from Geotech Engineering & <br />Testing for the soils investigation ($3,404). <br /> <br />The engineering fees for the design, plans and specifications for the design of the basic park <br />package totals $23,575. The engineering fees associated with the drainage analysis and <br />improvements on Driftwood total $4,330. The engineering fees associated with the <br />improvements above the base package including the design of the retaining wall, parking lot and <br />waterline totals $5,980. Taken altogether, the total fees, including the fees for the geotechnical <br />soils investigation, and an estimated $460 for expenses total $37,749 (see attached man hour and <br />fee spreadsheet for details). The work shall be done on an hourly basis and will not exceed this <br />amount without prior authorization from the Client. Invoices will be submitted monthly and will <br />be due upon receipt. <br /> <br />Schedule <br />We understand that time is of the essence on this project. We estimate that it will take <br />approximately four (4) to (6) weeks to complete the above-described work and produce the <br />design plans and specifications for the basic park package once we receive the completed <br />topographic survey from the City. Upon receipt of the executed letter agreement, we will <br />immediately authorize the geotechnical engineer to proceed. <br /> <br />We appreciate the opportunity to submit this proposal for your consideration and look forward to <br />working with you on this important project. <br /> <br />Respectively submitted, <br /> <br />CIVIL TECH ENGINEERING, INc. <br /> <br />ACCEPTED BY: <br /> <br />~d~ f)~ <br /> <br />Michael D. Lacy, P.E. <br />Vice President <br /> <br /> <br />Type or Print Name <br /> <br />Tt:f:Joc-fro. k fYl tt -hpYl QIlc(Y <br />4.~~. 0</ <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.