My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2004-1501-KKK not approved
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2004
>
O-2004-1501-KKK not approved
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:12 PM
Creation date
7/16/2007 3:13:30 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
4/26/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Preserve at Taylor Bayou <br />March 24, 2004 <br />Page 3 of5 <br /> <br />given the parameters stated above, will rate no worse than LOS Band <br />concludes no adverse impact for this development. <br /> <br />. Topography - This area is relatively flat and stable and should not be an <br />obstacle to this type of development. <br /> <br />. Density - Staff utilized the Land Use Plan as a guide. With the designated land <br />use as Low Density Residential and applying a development ratio of 4.8 units <br />per acre (Section 106-333) to 107 acres, Mr. Burchfield feels the property could <br />yield approximately 514 single-family units. This current plan designates only <br />28 acres to be developed as multi-family residential. Applying a density of 14 <br />units per acre, this yields 398 units. So, an additional 2 units as a density bonus <br />would need to be allowed for this project. <br /> <br />. Utilities - There are sufficient water distribution facilities along McCabe Road <br />to supply potable water and fire protection to this proposed project. Provisions <br />will have to be made to ensure that sufficient utility extensions can be made to <br />serve this development. Sanitary sewer service is not readily available to this <br />site. There is a sewer force main located along the south line of this property that <br />transports sewer to the Gulf Coast Waste Disposal Authority plant. <br /> <br />The City prepared a long-term sanitary sewer master plan for providing sewer <br />service to unserved areas of southeast La Porte. The master plan calls for the <br />elimination of a lift station #12 and new lift station to be constructed near the <br />comer of intersection of AI04 and McCabe Road. This master plan has been <br />provided to Mr. Burchfield's consultant (and to Arete's consultant). <br /> <br />Per the SCUP and Development Agreement and/or future approvals of the plats <br />and construction drawings will need to be in accordance with this plan or agreed <br />modifications. <br /> <br />. Drainage - This property lies within the Taylor Bayou Watershed. The City has <br />a master drainage plan for the Taylor Bayou Watershed that was performed by <br />the Civil Tech Last year. The plan calls for regional detention for this area. <br />Efforts should be made to work with the developer north of McCabe Road <br />towards the implementation of this master drainage plan. However, there are not <br />sufficient channel improvements to directly receive storm water runoff from this <br />project. The plan shows that storm water will be managed using a 4-acre <br />detention basin system. If approved the design of the detention will be reviewed <br />by staff to insure consistency with ordinances and the Taylor Bayou Watershed <br />Plan. <br /> <br />. Nature Preserve - The applicant is willing to dedicate approximately 77.5 ac <br />nature preserve to the City. While the issues are being worked towards <br />resolution, several questions remain. In order to determine whether a concept <br />of dedicating "The Preserve" to the City of La Porte is in line with the Parks <br />Master Plan 2002 or even desirable. the con cent needs to be nresented in more <br />
The URL can be used to link to this page
Your browser does not support the video tag.