My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2004-2798
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2004
>
O-2004-2798
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:15 PM
Creation date
8/10/2007 8:37:47 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
12/13/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> SUPPLEMENTAL COMPENSATION <br />A Not to Exceed: The revised fees for the services rendered in the Preliminary, Design, Bid and Construction phases <br /> of Project as defined in Attachment SC of original agreement and Supplemental Scope described herein shall be <br /> computed on the basis ofthe Schedule of charges (see Exhibit "A") but shall not exceed the following: <br /> Total <br />I. Supplemental Preliminary and Design Phase Supplemental Original Revised <br /> (upon authorization by OWNER) #3 Fees F ees/w Fees <br /> Suppl#1&2 <br /> a. Basic Services: Items Al through A. 9 of Supplemental #2 $189,475 $189,475 <br /> b. Additional Services: <br /> -Topographical survey (Subconsultant plus 10%) <br /> (Item Ab.1.) $34,540 $34,540 <br /> -Geotechnical Investigation (Subconsultatn plus 1 0%) <br /> (Original of supplemental #1) $4,400 $4,400 <br /> -Traffic control plans, signal modification plans at <br /> Spencer Hwy, and addition of Signal Warrant Study and <br /> Signal plans for Fairmont intersection. (Item A b..2.) $30,915 $30,915 <br /> -Stormwater Pollution Prevention Plans (Item A b. 3.) $7,000 $7,000 <br /> -Hydraulic Impact analysis Report (cost not-to-exceed) <br /> (original scope plus Supplemental #2) <br /> (Item A b. 4) $13,260 $13,260 <br /> -Design Phase reimbursable expense (cost plus 10%) <br /> (Item A b. 5) $2,475 $2,475 <br /> Subtotal $0.00 $282,065 $282,065 <br />2. Construction Phase (upon authorization by OWNER) <br /> a. Bidding (Items B.a.I. through B.a.7) $3,850 $3,850 <br /> b. Construction (Items B.b.1 through B.b.13) $31,180 $31,180 <br /> c. Additional Services: <br /> -Assistance in bidders pre-qualification <br /> (cost-not-to-exceed) (Item B.c.1) $2,430 $2,430 <br /> -Construction Phase reimbursable expense <br /> (cost plus 10%) (Item B.c.2) $5,280 $2,695 $7,975 <br /> d. -Inspection (Project Representation Additional) $84,975 $84,975 <br /> Subtotal $90,255 $322,220 $412,475 <br /> Total Fee not-to-exceed $90,255 $322,220 $412,475 <br /> <br />If FNI sees the Scope of Services changing to that additional services are needed other than those listed in Scope of <br />Services, FNI will notify OWNER for OWNER'S approval before proceeding. Additional services shall be <br />computed Based on the Schedule of Charges. Statements for services shall not be submitted more frequently than <br />monthly. <br /> <br />B. Schedule of Charges: (See Exhibit "A") <br /> <br />CO -1 <br /> <br />FNI ~g <br />OWNER <br /> <br />T:LPTOl525Supplemental Compensation2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.