Laserfiche WebLink
<br />e <br /> <br />. <br /> <br />RESOLUTION NO. 85-2~ <br /> <br />A RESOLUTION REQUESTING THE TEXAS STATE DEPARTMENT OF <br />HIGHWAYS AND TRANSPORTATION TO IMPROVE THE NORTH BOUND FEEDER <br />ROAD OF STATE HIGHWAY 146 (NORTH 9TH STREET); AND PROVIDING AN <br />EFFECTIVE DATE HEREOF. <br /> <br />BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LA PORTE: <br /> <br />Section 1. The North Bound Feeder Road of State Highway <br /> <br />146 (North 9th Street), presently is one-way from West Main <br /> <br />Street, to approximately the intersection of 9th Street and West <br /> <br />Adams Street. The right-of-way of the Feeder between West Adams <br /> <br />Street and West Tyler Street is unimproved. <br /> <br />The right-of-way <br /> <br />from West Tyler Street north to Barbour's Cut Boulevard, is <br /> <br />improved and open to two-way traffic, however, the pavement is <br /> <br />in poor condition. <br /> <br />Section 2. In order to make this section of North Bound <br /> <br />Feeder Road a continuous street, from West Main Street to Barbour's <br /> <br />Cut Boulevard, approximately seven hundred (700) feet of new <br /> <br />pavement construction will be needed to connect the two paved <br /> <br />sections. Approximately fourteen hundred (1400) feet of the <br /> <br />existing improved North Bound Feeder Road will have to be re- <br /> <br />constructed, or overlayed, between the new pavement ending at West <br /> <br />Tyler, north to Barbour's Cut Boulevard. <br /> <br />Section 3. Inasmuch as the southern-most portion of this <br /> <br />Feeder Road is one-way, the entire section between West Main <br /> <br />Street and Barbour's Cut Boulevard should be designated one-way, <br /> <br />North Bound, upon completion <br /> <br />to insure the safety of the <br /> <br />traveling public. <br /> <br />Section 4. The City Council of the City of La Porte <br /> <br />petitions the Texas State Department of Highways and Transporta- <br /> <br />tion, to take immediate steps to approve and fund the construction <br /> <br />of a North Bound Feeder on State Highway 146 in La Porte, from <br /> <br />West Main Street to Barbour's Cut Boulevard, at the earliest <br /> <br />possible date. <br />