Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />the cooling tower(s) where the water would be cooled. This process <br />would be repeated over and over again. <br /> <br />EQUIPMENT LIST: <br /> <br />Cooling Tower <br /> <br />Pumps <br /> <br />Motors <br /> <br />Electrical and Instrumentation <br /> <br />Distribution Piping <br /> <br />Miscellaneous Costs <br />Engineering <br />Construction Overhead <br />Taxes <br />Capitalized Interest <br />Contingencies <br /> <br />II. WASTEWATER TREATMENT <br />Project No. W-151 <br /> <br />PURPOSE: <br /> <br />To provide facilities to neutralize flow from wastewater collection <br />headers prior to discharging into the treatment plant. <br /> <br />To provide adequate dewatering facilities for both primary and bio- <br />logical solids. <br /> <br />To provide facilities for tank truck unloading and wash-out. <br /> <br />Upgrade effluent piping from bio-reactors to clarifiers. <br /> <br />PROCESS DESCRIPTION <br /> <br />Organic process wastewater is collected and pumped to the Texas Opera- <br />tions Wastewater Treatment Plant. The collection header flow is to be <br />neutralized and discharged into the bio-reactors. In the bio-reactors, <br />the organics are oxidized by microbial organisms to carbon dioxide, <br /> <br />A-4 <br />