Laserfiche WebLink
<br />24 <br /> <br />Further infrastructure enhancements include: <br />. Feasibility Study for Water and Sewer Service for Areas Adjacent to Canada Road (9-12-02) by <br />Freese & Nichols <br /> <br />. Preliminary Engineering Report for Large Diameter Trunk Sewer for proposed Bay Area Blvd <br />Extension (date unknown) by SCL Engineering <br /> <br />. Sludge Handling Facilities Evaluation (September 12, 2000) and Preliminary Engineering Report <br />for the Little Cedar Bayou WWTP Sludge Handling Facilities Improvements <br /> <br />. Preliminary Engineering Report (7-20-05) for the Little Cedar Bayou Wastewater Treatment Plant <br />1.0 MGD Expansion <br />