<br />\:'.AIX Document G70rM - 2001 <br /> <br />Change Order <br /> <br />CHANGE ORDER NUMBER: 003 <br />DATE: March 7, 2007 <br /> <br />OWNER: [gI <br />ARCHITECT: [gI <br />CONTRACTOR: [gI <br />FIELD: [gI <br />OTHER: 0 <br /> <br />PROJECT (Name and address): <br /> <br />LaPorte Police Department <br />3001 North 23rd Street <br />La Porte, Texas 77571 <br /> <br />TO CONTRACTOR (Name and address): <br /> <br />Hale-Mills Construction, Ltd. <br />4130 Bellaire Boulevard, Suite 210 <br />Houston, Texas 77025 <br /> <br />ARCHITECT'S PROJECT NUMBER: <br />CONTRACT DATE: November 28, 2005 <br />CONTRACT FOR: General Construction <br /> <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) <br />Original FF&E Budget $650,000.00 <br />Mailboxes: Salsbury (installed) including rear cover $6,432.00 <br />Lockers: FCI (installed) $22,153.00 <br />Vechicle Lift: Mohawk (unloaded and installed) $6,800.00 <br />Lab Casework: Hallmark (installed) $46,800.00 <br />Seating: Car Stone (delivered only) $4,805.00 <br />SUBTOTAL <br />CAT 5 to CAT 6 upgrade <br />DVR Credit <br />SUBTOTAL <br />FF&E Funds retained <br />SUBTOTAL <br />TOTAL FF&E REIMBURSMENT TO OWNER <br /> <br /><$86,430.00> <br />$5,000.00 <br /><$6,000.00> <br /> <br /><$1,000.00> <br /> <br />$10,000.00 <br /><$10,000.00> <br /><$553,770.00> <br /> <br />The original Contract Sum was <br />The net change by previously authorized Change Orders <br />The Contract Sum prior to this Change Order was <br />The Contract Sum will be decreased by this Change Order in the amount of <br />The new Contract Sum including this Change Order will be <br /> <br />The Contract Time will be unchanged by Zero ( 0 ) days. <br />The date of Substantial Completion as of the date of this Change Order therefore is June 30, 2007 <br /> <br />$ <br />$ <br />$ <br />$ <br />$ <br /> <br />9,991,758.00 <br />-57,900.00 <br />9,933,858.00 <br />-574,010.00 <br />9,359,848.00 <br /> <br />NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which <br />have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and <br />Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br /> <br />AlA Document G701™ - 2001. Copyright @ 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AlA'" <br />Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AlA'" Document, or any <br />portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document <br />was produced by AlA software at 08:16:32 on 03/07/2007 under Order No.1000289411_1 which expires on 3/1/2008, and is not for resale. <br />User Notes: (2454238067) <br /> <br />1 <br />