Laserfiche WebLink
<br />REQUEST FOR CITY COUNCIL AGENDA ITEM <br /> <br /> <br />Appropriation <br /> <br />Source of Funds: <br /> <br />CDBG <br /> <br />Department: Planninl! <br /> <br />Account Number: <br /> <br />Grant Fund 032 <br /> <br />Budgeted Item: <br /> <br />$117.535.00 <br />$113.133.41 <br />YES <br /> <br />Report: X Resolution: <br /> <br />Ordinance: X <br /> <br />Amount Budgeted: <br /> <br />Exhibits: Bid Tab CLP #06012 <br />Ordinance <br />Letter from Harris County Dated 7-5-06 <br /> <br />Amount Requested: <br /> <br />SUMMARY & RECOMMENDATION <br /> <br />Harris County Community & Economic Development Department previously awarded the City a CDBG grant to extend and pave <br />North 2nd Street to the E Street ROW. The original grant proposal was to extend 2nd Street and utilities. The original amount <br />awarded was $56,475.00 with $55.910.25 for construction. The scope that came back with the contract was only for paving. The <br />contract also did not allow the use of in-house assets to pave the street. The City notified Harris County that the project was short <br />funds to complete the project. On March 27, 2006, City Council amended the budget to accept an additional Harris County award <br />of $40,000 bringing the total construction funding to $95,910. <br /> <br />Since awarding the grant, Harris County has changed project officers twice. Although not stated in the scope, the new County <br />project officer stated that the extension ofthe water line with the paving was allowable. As part of the City's leveraging funds, <br />the City has cleared and grubbed the North 2nd Street ROW, surveyed the project area and the Engineer Division designed and bid <br />the project. Given the additional funding, the project was designed with the water line extension included. There were no <br />bidders on the first publication. Harris County instructed the City to re-bid. <br /> <br />On the second bidding period, the City received 2 bids with low bid of$132,936.33 from TEXCOR Construction: <br /> <br />. Paving $92,332.01 <br />. Drainage $ 8,769.99 <br />. Waterline $21,lB4.33 <br />. Contingencies/Other Work $10,000.00 <br />Value engineering was considered by substituting the lime stabilized sub-grade with low plasticity select fill as well as using <br />calcium sulfate instead of cement as a binder in the flexible base. These prospective changes resulted in a net decrease in the cost <br />of the project by $2,506.81. Accepting the substitutions, however, would increase maintenance costs over the lifespan of the <br />street so the substitutions were rejected. <br /> <br />The apparent low bidder was over the budgeted amount and City staff requested additional CDBG funding to augment the <br />construction fund. After several months Harris County came back with an additional $21,625, bringing the total construction <br />funding to $117,535. Since the initial opening ofthe bids enough time has elapsed where the contractor can amendhis/her prices <br />due to material and labor increases. The following is the amended low bid from TEXCOR Construction reflecting these changes <br />(the bold indicates the change): <br /> <br />. Paving $92,332.01 + $5,927.10 <br />. Drainage $ ~,7690.99+ 1,505-.6& <br />. Waterline $21,834.33 + no change <br />· Contingencies $10,000.00 + no change <br />The amended bid total is $140,369.03. City staff has notified the contractor and it is mutually agreed that the waterline portion ofthe <br />contract will be omitted from the contract, reducing the contract price to $118,534.70. Public Works has agreed to extend the <br />waterline and pay for the materials, as approved. Additionally, City will provide traffic control for the project at an additional savings <br />of$5,401.29, bringing the construction project within budget ($113,133.41). <br /> <br />Staff recommends awarding the bid to TEXCOR Construction for the paving and drainage ofN. 2nd Street. <br />Action Required bv Council: <br />1. Consider and take action on an Ordinance to award a bid in the amount of$113,133.41 to TEXCOR Construction for the <br />paving and drainage for North 2nd Street. <br />2. Direct Staff to issue a notice to commence construction. <br />A d for Ci Co ncil A enda <br /> <br /> <br />q -- d-f) --0 ~ <br /> <br />Date <br />