My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2007-3048
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2007
>
O-2007-3048
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:24 PM
Creation date
1/15/2008 11:03:45 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
12/17/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The 6" pipeline will be 6.625" outside diameter with 0.280" wall thickness, and will be <br />API 51 X 42 ER W pipe with 15-22 mils thick fusion bond epoxy coating and 25 mils aro <br />coating. The 6" pipeline will operate at a maximum operating pressure of 1440 PSI, will <br />be tested to a minimum 2180 PSI, and have a minimum yield strength of 42,000 PSI. <br /> <br />The pipelines will be regulated by the Texas Railroad Commission as an Intrastate <br />Pipeline. All design, materials and construction will, as a minimum, comply with the <br />following codes, ordinances and standards as applicable: <br /> <br />· The Department of Transportation ("DOT") Standard CFR Title 49, Part 195 <br />"Transportation of Hazardous Liquids by Pipeline", and The "Railroad <br />Commission of Texas, Pipeline Safety Rules, Part IV <br /> <br />· ASME B31.8. "Gas Transmission and Distribution Piping Systems, <br /> <br />· u.S. Department of Labor Regulations Title 29, CFR 1910 and 1925, <br />"Occupational Safety and Health Standards", <br /> <br />· API 1104, "Standard for Welding Pipelines and Related Facilities". <br /> <br />HSC PIPELINE PARTNERSHIP, L.P. hereby makes this statement, that it agrees to the <br />conditions and obligations set out in ORDINANCE NO. 2004 - of the City of La Porte <br />Pipeline Ordinance; Section 1; Article IV. Pipeline Transportation, Sec 102-235 <br />Application for Permit 3 0), 3 (k), and 3 (1), and all sections thereof that apply, regardless <br />if said section(s) are specifically mentioned in this letter. <br /> <br />The anticipated construction start date is scheduled to begin by December 17, 2007. <br /> <br />Also enclosed herewith is a check in the amount of $ 1,000.00 for initial permit fee and <br />the appropriate insurance certificate. If additional information is required, please contact <br />David Turnbo, at (713) 644-3219 or 713-252-2151. <br /> <br />Thank you in advance for your prompt attention to this matter. <br /> <br />Sincerely, <br /> <br />]) o--dJ ? ~ <br /> <br />David Turnbo, Agent <br />Land & Right of Way Department <br />
The URL can be used to link to this page
Your browser does not support the video tag.