My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2007-3049
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2007
>
O-2007-3049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:24 PM
Creation date
1/15/2008 11:14:50 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
12/17/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ff. J!a77 - r;~ <br /> <br />GULLETT & ASSOCIATES, INC. <br /> <br />n05 South Loop East-nOl2 <br />P.O. Box 230187 - 77223 <br />Houston, Texas <br />713-644-3219 <br />Fax: 713-649-0020 <br /> <br />December 4, 2007 <br /> <br />Planning Department <br />Mr. Rodney L. Slaton <br />City of La Porte <br />604 W. Fairmont Parkway <br />La Porte, Texas 77571 <br /> <br />RE: Revised Permit Application package for HSC PIPELINE PARTNERSHIP, L.P. to <br />install one 12" pipeline and one 8" pipeline within the city limits of the City of La <br />Porte, Harris County, Texas. <br /> <br />Dear Mr. Slaton: <br /> <br />HSC PIPELINE PARTNERSHIP, L.P. a Delaware limited partnership whose address is <br />P.O. Box 4324 Houston, Texas 77210-4324, is hereby requesting a pipeline permit. <br /> <br />The pipeline system will be used to transport natural gas liquids (MSDS sheet attached). <br />The 12" pipeline starts from an existing valve site/pipeline in the Pasadena Refinery area <br />runs to a surface site in Laporte. The 8" pipeline exits the site crossing HWY 225 and <br />terminating at an existing valve site North of Hwy 225. The route through the City of La <br />Porte is shown on the attached map, and described in the permit application form. The <br />12" and 8" pipeline will be installed in an existing pipeline corridor or parallel existing <br />pipelines the entire route. Plan and profile are attached showing the city streets in the City <br />of La Porte that will be crossed. <br /> <br />12" crossing Underwood Road <br />Drawing CA-2867-012, Cad File 2867112_ <br />12" crossing Houston Street <br />Drawing CA-2867-019, Cad File 2867119A <br />8" crossing Houston Street <br />Drawing CA-2867-019, Cad File 2867119A-1 <br />8" crossing Old La Porte Road <br />Drawing CA-2867-017, Cad File 2867117_ <br /> <br />The 12" pipeline will be 12.750" outside diameter with a 0.250 wall thickness, and will <br />be API 5L X 52 ERW pipe with 15-22 mils thick fusion bond epoxy coating and 25-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.