Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />AGREEMENT <br /> <br />THE STATE OF TEXAS ~ <br />COUNTY OF HARRIS ~ <br />CITY OF LA PORTE ~ <br /> <br />This Agreement is made and entered into by and between City of La Porte, a body <br />cotporate and politic under the laws of the State of Texas, hereinafter called "City," and the <br />Fairmont Park East Homeowner's Association, Incorporated, a non-profit corporation chartered <br />under the laws of the State of Texas, hereinafter called "FPEHOA It; <br /> <br />RECITALS: <br /> <br />1. It is to the mutual benefit of City and FPBHOA to construct and develop a <br />combination park and detention basin facility, on land owned by City as a joint venture designated <br />herein, including parking facilities, storm sewer connections, park service equipment and related <br />appurtenances, hereinafter called the "Project." <br /> <br />2. The Project will include construction, relocations and/or improvements involving <br />earthmoving, a retaining wall, pond establishment and other basic improvements designed to <br />provide stormwat'er storage and park shaping, hereinafter sometimes called the "Phase I Park & <br />Basin Improvements". It is recognized that the retaining wall and associated earthwork is an <br />enhancement, but is included in Phase I Parlc&'Basin Improvements for cost efficiency. That part <br />of the Project that includes a parking lot, sidewalks. and park service equipment shall sometimes <br />be called the "Phase n Basic Park Provision". That part of the Project that includes waterfall and <br />other enhanced appurtenances shall sometimes be called "Phase ill Park Enhancements". <br /> <br />3. The FPEHOA is willing to contnbute $35,000 toward costs of Phase I Park & Basin <br />Improvements, provided that City will contdbute the remaining costs to construct the Phase I <br />Park & pasin Improvements. The FPBHOA is willing to contnbute $20,000 toward costs of the <br />Phase n Basic Park Provision, provided that City will contnbute the remaining costs to construct <br />the Phase n Basic Park Provision. The FPBHOA is willing to contnbute $20,000 toward costs of <br />the Phase ill Park Enhancements, provided that City will contribute the remaining costs to <br />construct the Phase ill Park Enhancements. The administration of design and construction of the <br />Project will be considered the purview of the City. City has caused the design of all phases of the <br />Project to be completed. All costs attnbutable to the cost of the Phase I Park & Basin <br />Improvements, including costs of engineering, construction and construction support services will <br />sometimes be called the "Phase I Park Improvement Costs." All costs attributable to the cost of the <br />Phase II Basic Park Provision, including engineering, construction and construction support <br />services will sometimes be called the " Phase n Basic Park Provision Costs." All costs <br />attrIbutable to the cost of the Phase ill Park Enhancements, including engineering, construction <br /> <br />Agreement - City of La Porte aud FPEHOA, Page 1 of 7 <br />