Laserfiche WebLink
<br />. <br /> <br />e <br /> <br />POINT CALCULATION TABLE <br /> <br />Fill in the Values from parts 1 through 7 in the columns below. Add the <br />numbers in the left column to determine the point total that the <br />wastewater syst~m has generated for the previous year. <br /> <br />Actual Values <br /> <br />Actual <br />Values <br /> <br />Maximum Possible <br /> <br />Part 1: Infl uent Fl ow/loadi ngs <br /> <br />o <br /> <br />80 Points <br /> <br />.- <br /> <br />Part 2: Effl uent Quality/Plant Performance 0 310 Points <br />Part 3: Age of WWTT <br /> 10 50 Points <br />Part 4: Overflows and Bypasses <br /> 50 100 Points <br />Part 5: Ultimate Disposition of Sludge <br /> 0 200 Points <br />Part 6: New Development <br /> 15 30 Points <br />Part 7: Operator Certification Training 10 150 Points <br /> <br />TOTAL POINTS <br /> <br />85 <br /> <br />920 Points <br /> <br />27 <br />