Laserfiche WebLink
<br />F. <br /> <br />e <br /> <br />e <br /> <br />6. List the average cesign flow and daily BOD~ loadings for your facility in <br />:hc ~lanks below. If you are not aware of-these design quantities, refer <br />to your C~M Manuel. <br /> <br />Average ,Flow <br />(MGD) <br /> <br />Daily BODS Loading <br />(Pounds per day) <br /> <br />Design Criteria: <br /> <br />7.56 <br /> <br />12,610 <br /> <br />90% of the Design Criteria: <br /> <br />6.80 <br /> <br />11 ,343 <br /> <br />c. <br /> <br />How many times did the monthly flow (Col. 1) to the WWTP exceed 90% of <br />the design flow? 0 (Circle the appropriate number) <br /> <br />~ = 0 pOint~ 5 or more = 5 points <br /> <br />How many times did the average monthly flow (Col. 1) to the WWTP exceed <br />the design flow? 0 (Circle the appropriate numbe~) <br /> <br />('{) = 0 ooint?J 1-2 = S points; 3-4 = 10 points; <br />5 or more = 15 points <br />AVERAGE <br />How many times did the manimwm daily BODS loading (Col. 3) to the WWTP <br />exceed 90% of the daily design loading? 0 (Circle the appropriate <br />number) <br /> <br />(0:1 = 0 pointS;) 2-4 = 5 points; 5 or more = 10 points <br /> <br />How many times did the ~~~g; daily BODS loading (Col. 3) to the WWTP <br />exceed the daily design loading? 0 (Circle the appropriate <br />nLJrnber) <br /> <br />O. <br /> <br />E. <br /> <br />~ = 0 Doint~ <br />3 = 30 points; <br /> <br />1 = 10 points; <br />4 = 40 points; <br /> <br />2 = 20 points; <br />5 or more = 50 points ' <br /> <br />G. List each point value you circled for C through F in the blanks below and <br />place the total in the box. . <br /> <br />C points = 0 <br />D points = 0 <br />E points = 0 <br />F poi nt s = 0 <br /> <br />TOTAL POINT VALUE FOR PART 1 <br /> <br />o <br /> <br />Enter this value on the point calculation table on the last page. <br /> <br />2 <br />